Free spider lift pre-start checklist

Jump to download form ↓

Enter your email below to download this spider lift pre-start checklist as a ready-to-use PDF.

Free spider lift pre-start checklist (PDF-ready). Outriggers, tracks, slope sensor, boom, basket and emergency descent per AS 2550.10 + AS 1418.10.

Jarrod Milford

Jarrod Milford

Commercial Director

Updated 24 May 2026

Updated 24 May 2026

How to use: download the PDF, print or complete digitally on any device.

  • PDF format, ready to print or fill on screen
  • Use as-is or customise to suit your operation
  • Go digital in MapTrack for photos, alerts and audit trails

Download free PDF template

FreePDFUpdated May 2026

Get your free template

Enter your email to download the spider lift pre-start checklist as a free PDF. No sign-up required to use it.

Rated 4.9 on G2Rated 4.9 on Capterra
Your info is secure. No spam, ever.

These templates are free general guides provided as-is. They do not constitute legal, safety or compliance advice. You are responsible for ensuring any form meets your specific workplace obligations, industry standards and applicable regulations.

G2 rating 4.9 out of 5Capterra rating 4.9 out of 5

Trusted by teams across Australia and New Zealand

We respect your privacy. Unsubscribe anytime.

Used by construction, mining and field service teams

Saunders InternationalMineral ResourcesSupagasHacer GroupMetro TunnelUltrabuilt

What is a spider lift pre-start checklist?

A spider lift pre-start checklist is a structured daily inspection completed by the licensed operator before any deployment of a tracked or wheeled compact mobile elevating work platform (MEWP) of the spider-lift family. Spider lifts are typically arboriculture, heritage facade, indoor cinema and church, and narrow-access lifts where a boom lift cannot fit and a scissor lift cannot reach. They deploy on four outriggers with pads or bog mats, and rely on a telescopic-articulating boom with a jib to reach over obstacles. That changes the pre-start emphasis from drive and ride safety to outrigger deployment, ground bearing, slope sensing and basket condition.

A proper spider lift pre-start walks the operator through the tracked or wheeled drive system, outrigger and stabiliser deployment, ground condition under each pad, slope sensor and tilt cut-out, the full telescopic and articulating boom, the jib and basket assembly, harness anchor points, the emergency descent (gravity manual or hand-pump hydraulic), narrow-access steering modes and the power source (battery, fuel or hybrid). In Australia the governing standards are AS 2550.10 (mobile elevating work platforms: safe use) and AS 1418.10 (design), under WHS Reg 5.1 plant duties. IPAF 1b/3b operator tickets, ANSI A92.20, OSHA 1926.453 and HSE PUWER 1998 are the international references used on multinational sites.

Learn more about pre-start inspections in MapTrack.

Benefits of using this spider lift pre-start checklist

  • Catch outrigger and ground bearing issues early: Verify pad bearing and bog mat condition before loading the boom, preventing mid-shift sink and unplanned topple risk.
  • Confirm slope sensor and tilt cut-out are live: A working tilt cut-out is the single most important interlock on a spider lift on uneven ground.
  • Meet AS 2550.10 and WHS evidence requirements: A signed daily record demonstrates plant safety duty under WHS Reg 5.1 and supports IPAF or ANSI audits on multinational sites.
  • Protect tracks, outriggers and telescopic sections from preventable wear: Daily checks of pins, hoses and cylinder rods extend boom life and reduce hire-fleet damage charges.
  • Verify emergency descent before sending the operator up: Confirms the manual gravity or hand-pump system works and that the ground attendant knows the procedure.
  • Confirm basket and anchor condition before harness attachment: Catches cracked anchor welds, damaged basket gates and missing inertia reel anchor points.
  • Build a defensible audit trail per asset: Daily logs per serial number support insurer claims, hire return condition reports and post-incident investigations.

Benefits of digitising forms in MapTrack

When you digitise spider lift checklists in MapTrack, you get:

  • Field users can easily scan a QR code to complete a form on mobile. Unlimited users.
  • Automatically get alerts when faults are identified.
  • Link every form digitally as a PDF to the relevant asset, location or person.
  • Receive a digital PDF copy with every submission to your email.
  • Ability to share forms digitally.
  • Build conditional logic (show or hide questions based on answers).
  • Take pictures or attach photos. Not possible with a paper-based form.
  • Electronic signatures.
  • Edit forms later without reprinting.
  • Restrict permissions (who can view, complete or approve).
  • Build forms with AI (describe what you need and MapTrack suggests the form).
  • Auto-schedule pre-start forms so operators are prompted before every shift.
  • Flag overdue pre-starts on the dashboard so nothing leaves the yard unchecked.
  • Link each pre-start to the asset record for a complete inspection history.

Book a demo to see how MapTrack handles spider lift checklists.

Try MapTrack free for 30 days

Full access to every feature. No credit card required. Per-asset pricing so you scale as your fleet grows.

  • No credit card required
  • 30 days free trial
  • Cancel anytime

1-2 days/week saved

Bloody amazing! We used to spend 1-2 days a week tracking and managing our generators alone.
Saunders International

Steve McAllister

Asset Coordinator, Saunders International

What to include in a spider lift pre-start checklist

This spider lift pre-start checklist covers 12 key areas:

  • Tracks or wheels, drive motors, tensioners and rubber pads inspected.
  • Outrigger jacks, pads and cylinders extended and visually checked for leaks.
  • Ground condition under each pad assessed, with bog mats placed where required.
  • Slope sensor, tilt indicator and platform tilt cut-out interlock tested.
  • Telescopic boom sections, pins, hoses and cylinder rods checked for damage.
  • Jib articulation, pivot pins and limit switches inspected and tested.
  • Basket frame, gate, floor mesh and harness anchor points inspected.
  • Emergency descent system (gravity or hand-pump) tested per OEM manual.
  • Lower and upper control consoles functional with emergency stops tested.
  • Battery state of charge, hybrid fuel level and charger cable condition checked.
  • Site walk for no-go obstacles, overhead lines, soft ground and slope hazards.
  • Operator IPAF 1b/3b ticket, high-risk work licence and induction current.

How to use this spider lift pre-start checklist

  1. Confirm operator competency and walk the site.: Verify the operator holds a current EWP yellow card or IPAF 1b/3b ticket and the high-risk work licence required for the configuration. Walk the work zone for overhead lines, soft ground, slope, no-go obstacles, public exposure and weather conditions before driving the machine in.
  2. Inspect tracks or wheels and drive system.: Walk a full lap of the chassis. Check tracks for cuts, missing pads or stretched links, or wheels for tyre condition and lug torque. Inspect drive motors, hydraulic lines and the chassis for leaks, cracks or fresh impact damage from the last shift.
  3. Deploy outriggers and verify ground bearing.: Position the machine and deploy each outrigger in turn, watching cylinder rods for scoring or leaks. Confirm each pad is on firm ground or a properly sized bog mat. Verify the slope sensor goes green and the platform tilt cut-out interlock arms before any boom movement.
  4. Inspect boom, jib and basket from the ground.: Walk the full extension path visually. Inspect each telescopic section, wear pads, hoses and cylinder rods. Check jib pivot pins, jib cylinder, basket frame, gate, mesh floor and the dedicated harness anchor points for cracked welds or missing pins.
  5. Test controls and safety devices.: Start the lift, test the lower control console first, then move to the basket. Test boom up/down, slew, telescope, jib articulation, basket rotation, foot-pedal interlock, emergency stop on both consoles and the slope tilt cut-out (tilt the platform to verify it cuts drive).
  6. Verify emergency descent and brief the ground attendant.: Test the manual gravity or hand-pump hydraulic descent per the OEM procedure. Confirm a ground attendant is identified, knows how to operate the lower controls and emergency descent, and has a means of communication with the operator.
  7. Sign and lodge the record.: Sign and date the checklist, log any defects with a photo, fix on the spot if minor or tag-out if not. In MapTrack the pre-start attaches to the asset record so run hours, defect history and the next service interval are visible to the next operator.

In MapTrack, you can run digital pre-starts attached to each asset. Each submission is stored as a timestamped PDF against the asset record.

Get the free templateEnter your email above to download the full spider lift pre-start checklist as a PDF.Back to download form

How often should you complete this checklist?

A full spider lift pre-start is required at the start of every shift the lift is operated, and again whenever the operator changes mid-shift, the lift is relocated to a new setup point with different ground conditions, or it is brought back into service after a fault. AS 2550.10 makes daily inspection the responsibility of the competent operator. On top of the daily pre-start, run a weekly or 50-hour inspection per the OEM manual, a monthly or 250-hour inspection, an annual major service, and the AS 2550.10 ten-year major inspection for the machine class. MapTrack schedules pre-start, 50-hour, 250-hour, 500-hour, annual and 10-year intervals against each spider lift serial automatically.

Frequently asked questions

AS 2550.10 covers safe use of mobile elevating work platforms (including spider lifts) and AS 1418.10 covers design. Both sit under WHS Reg 5.1 plant duties. The combined requirement is that a competent operator completes a documented pre-start at the start of every shift, with the operator holding either a high-risk work licence or an EWP yellow card depending on platform height and configuration.

On multinational sites, an IPAF 1b/3b ticket is widely accepted as evidence of competency for category 1b (static boom) and 3b (mobile boom) MEWPs, which includes most spider lifts. In Australia, sites also expect the EWP yellow card (for platforms under 11 m) or the relevant high-risk work licence (for boom length 11 m or more). Hold both for cross-border work.

A truck or self-propelled boom lift drives on its own chassis and rarely deploys outriggers, so the pre-start emphasis is drive system, ride safety and boom. A spider lift always deploys outriggers on bog mats or soft ground, climbs steep access and operates indoors as often as outdoors, so the pre-start emphasises outrigger pads, ground bearing, slope sensor cut-out and narrow-access steering modes.

AS 2550.10 requires a major inspection of mobile elevating work platforms after 10 years from the date of manufacture and at 10-year intervals after that. The major inspection is in addition to the daily pre-start, 50-hour weekly, 250-hour monthly, quarterly and annual services. It is typically completed by the manufacturer or an authorised service agent, not the operator.

Yes, that is one of the main use cases for tracked spider lifts in cinemas, churches and heritage facades. The pre-start should add a check that the rubber tracks or non-marking pads are fitted, that the floor loading rating (point load under each outrigger pad) is below the structural limit, and that the slope sensor is set for the indoor configuration if the OEM offers a separate mode.

If an outrigger pad sinks during operation, the slope sensor and platform tilt cut-out should detect the change and cut drive to the boom. The operator should stop, lower the boom using the emergency descent if needed, fully retract and re-stow before the machine is repositioned. Re-run a fresh pre-start and reseat outriggers on larger bog mats or a different setup point.

Yes. This spider lift pre-start checklist is completely free to download and use - open the HTML file in any browser and use Print then Save as PDF. No MapTrack account is required. It suits arborists, facade and heritage crews, and hire fleets running tracked or wheeled spider lifts in narrow-access and indoor work. If you later want to move off paper and clipboards, MapTrack turns this into a live digital pre-start: scan a QR code on each lift to pull up its history, complete the outrigger, ground-bearing and slope cut-out checks on a phone, get automated 50-hour, 250-hour, annual and 10-year inspection reminders against each serial, and keep a complete timestamped audit trail with instant compliance reporting, so nothing slips through across your fleet and sites. Start free at maptrack.com/free-trial or book a demo.

Applicable regulatory standards

This template aligns with the following regulations and standards:

  • AS 2550.10
  • AS 1418.10
  • WHS Reg 5.1
  • OSHA 1926.453
  • HSE PUWER 1998

Embed this free template on your website

Run an industry blog, trade association site, or training resource? Drop a preview of this free spider lift pre-start checklist straight into your page. The snippet is self-contained, needs no scripts, and links readers back to the full free template.

<div style="max-width:480px;font-family:system-ui,-apple-system,'Segoe UI',Roboto,sans-serif;border:1px solid #E5E7EB;border-radius:12px;padding:20px;background:#ffffff;">
  <p style="font-size:12px;font-weight:700;letter-spacing:0.05em;text-transform:uppercase;color:#0E7490;margin:0;">Free template</p>
  <p style="font-size:18px;font-weight:700;color:#071D49;margin:6px 0 0;">Spider Lift Pre-Start Checklist</p>
  <ul style="margin:12px 0 0;padding-left:18px;color:#374151;font-size:14px;line-height:1.6;">
    <li style="margin:4px 0;">Tracks or wheels, drive motors, tensioners and rubber pads inspected.</li>
    <li style="margin:4px 0;">Outrigger jacks, pads and cylinders extended and visually checked for leaks.</li>
    <li style="margin:4px 0;">Ground condition under each pad assessed, with bog mats placed where required.</li>
    <li style="margin:4px 0;">Slope sensor, tilt indicator and platform tilt cut-out interlock tested.</li>
    <li style="margin:4px 0;">Telescopic boom sections, pins, hoses and cylinder rods checked for damage.</li>
    <li style="margin:4px 0;">Jib articulation, pivot pins and limit switches inspected and tested.</li>
  </ul>
  <p style="font-size:13px;color:#6B7280;margin:14px 0 0;padding-top:12px;border-top:1px solid #E5E7EB;">Free <a href="https://www.maptrack.com/templates/spider-lift-pre-start-checklist" style="color:#071D49;font-weight:600;text-decoration:none;">Spider Lift Pre-Start Checklist</a> by MapTrack</p>
</div>

Please keep the “by MapTrack” attribution link in the snippet.

Need to run digital pre-starts attached to each asset?

Register every spider lift in MapTrack, attach digital forms, and get a complete history of every inspection, service and compliance record.

Pre-start inspections · All templates · Pricing · Book a demo