Skip to main content
Skip to download form

Free overhead crane annual service procedure

Free overhead crane annual service checklist (PDF-ready). Wire rope measurement, brake overhaul, load test, NDT and AS 1418 certification. Download free.

Updated 3 May 2026

Overhead Crane Annual Service Procedure

Annual service - overhead crane, bridge crane and gantry crane (AS 1418 / AS 2550)

Live form
0 of 12 checks

Wire Rope Measurement

1Wire rope measurement (diameter at 3 points, broken wires per lay length - compare to rejection criteria AS 2759)

Brake Overhaul

2Full brake overhaul (hoist, travel - reline linings if worn, adjust torque)

Structural Inspection

3Structural inspection (main beams, end carriages, connection welds, runway beams)
4NDT of critical welds (if due per manufacturer or 10-year schedule)

Load Testing

5Rated capacity load test (SWL with calibrated weights)

Electrical

6Electrical insulation resistance test (all motors, contactors)

Gearbox and Drivetrain

7Inspect hoist gearbox oil (sample or change)
8Replace worn trolley wheels and travel wheels

Runway and Alignment

9Check runway rail alignment (survey)

Overload Protection

10Recalibrate overload protection (if fitted)

Certification

11Update compliance sticker and logbook
12Certification per AS 1418 / AS 2550

How to use: download the PDF, print or complete digitally on any device.

  • PDF format, ready to print or fill on screen
  • Use as-is or customise to suit your operation
  • Go digital in MapTrack for photos, alerts and audit trails

Download free PDF template

Use in MapTrack →
FreePDFUpdated May 2026

Get your free template

Enter your email to download the overhead crane annual service procedure as a free PDF. No sign-up required to use it.

Rated 4.9 on G2Rated 5.0 on Capterra
Your info is secure. No spam, ever.

These templates are free general guides provided as-is. They do not constitute legal, safety or compliance advice. You are responsible for ensuring any form meets your specific workplace obligations, industry standards and applicable regulations.

G2 rating 4.9 out of 5Capterra rating 5.0 out of 5

Trusted by teams across Australia and New Zealand

We respect your privacy. Unsubscribe anytime.

Or set it up in MapTrack

  • Fill it in on a phone, attach photos to any check
  • Automatic reports and audit trails
  • The same checks as the PDF, ready to configure

Free 30-day trial. No credit card. Personal email accepted.

Don't just download it - use it live. Start a free workspace with this overhead crane annual service procedure already built, so your crew can run it from a phone.

Jarrod Milford

Jarrod Milford

Commercial Director

Updated 3 May 2026

Key takeaways

  • The MapTrack overhead crane annual service procedure contains 12 checks across 9 sections. Sections covered: Wire Rope Measurement, Brake Overhaul, Structural Inspection, Load Testing, Electrical, Gearbox and Drivetrain, Runway and Alignment, Overload Protection, Certification.

Enter your email below to download this overhead crane annual service procedure as a ready-to-use PDF.

Used by construction, mining and field service teams

Saunders InternationalMineral ResourcesSupagasHacer GroupMetro TunnelUltrabuilt

What is a overhead crane annual service procedure?

An annual service is the most comprehensive scheduled maintenance event for an overhead crane, bridge crane or gantry crane. It is performed every 12 months by a competent person and includes all monthly inspection items plus additional tasks that require extended downtime, specialist equipment or certification authority. The annual service adds wire rope measurement against AS 2759 rejection criteria, full brake overhaul (relining if worn), structural inspection of main beams, end carriages and connection welds, NDT of critical welds (if due), rated capacity load test with calibrated weights, electrical insulation resistance testing, hoist gearbox oil inspection or change, wheel replacement assessment, runway rail alignment survey, overload protection recalibration, and certification per AS 1418 / AS 2550. This is a carry-forward service: it includes every task from the monthly inspection, so both are completed in a single visit.

In Australia, overhead cranes are classified as high-risk plant under the WHS Regulations 2011, Chapter 5, Part 5.3, and must be registered with the state or territory regulator. AS 2550.1 and AS 1418 set out the inspection, testing and maintenance requirements. The annual service is the primary compliance event, and the completed report must be retained for the life of the crane. Insurance policies for lifting equipment typically require evidence of annual inspections by a competent person.

Learn more about maintenance and work orders in MapTrack.

Benefits of using this overhead crane annual service procedure

  • Regulatory compliance: annual servicing with certification per AS 1418 / AS 2550 satisfies WHS obligations, insurance requirements and audit expectations.
  • Structural integrity: NDT of critical welds and structural inspection of beams and carriages identifies fatigue cracks before they become safety risks.
  • Load capacity assurance: rated capacity load testing with calibrated weights confirms the crane can safely handle its SWL, protecting operators and loads.
  • Extended component life: brake overhaul, wheel replacement and gearbox oil service prevent premature failure of expensive drivetrain components.
  • Reduced unplanned downtime: comprehensive annual servicing catches issues that monthly inspections may miss, reducing the risk of mid-production breakdowns.
  • Documentation trail: a completed annual service record with certification provides an auditable compliance history for each crane.

Benefits of digitising forms in MapTrack

When you digitise overhead crane service procedures in MapTrack, you get:

  • Field users can easily scan a QR code to complete a form on mobile. Unlimited users.
  • Automatically get alerts when faults are identified.
  • Link every form digitally as a PDF to the relevant asset, location or person.
  • Receive a digital PDF copy with every submission to your email.
  • Ability to share forms digitally.
  • Build conditional logic (show or hide questions based on answers).
  • Take pictures or attach photos. Not possible with a paper-based form.
  • Electronic signatures.
  • Edit forms later without reprinting.
  • Restrict permissions (who can view, complete or approve).
  • Build forms with AI (describe what you need and MapTrack suggests the form).
  • Trigger work orders automatically when a fault is logged during an inspection.
  • Track service intervals by hours, kilometres or calendar date in one place.
  • Attach supplier invoices and parts receipts to each maintenance record.

Book a demo to see how MapTrack handles overhead crane service procedures.

Try MapTrack free for 30 days

Full access to every feature. No credit card required. Per-asset pricing so you scale as your fleet grows.

  • No credit card required
  • 30 days free trial
  • Cancel anytime

1-2 days/week saved

Bloody amazing! We used to spend 1-2 days a week tracking and managing our generators alone.
Saunders International

Steve McAllister

Asset Coordinator, Saunders International

What to include in a overhead crane annual service procedure

This overhead crane annual service procedure covers 10 key areas:

  • Wire rope measurement: diameter at 3 points, broken wires per lay length, compared to AS 2759 rejection criteria.
  • Brake overhaul: full overhaul of hoist and travel brakes, reline linings if worn, adjust torque.
  • Structural inspection: main beams, end carriages, connection welds, runway beams.
  • NDT: non-destructive testing of critical welds (if due per manufacturer or 10-year schedule).
  • Load testing: rated capacity load test (SWL) with calibrated weights.
  • Electrical testing: insulation resistance test of all motors and contactors.
  • Gearbox and drivetrain: inspect or change hoist gearbox oil, replace worn trolley and travel wheels.
  • Runway alignment: runway rail alignment survey.
  • Overload protection: recalibrate overload protection (if fitted).
  • Certification: update compliance sticker and logbook, certification per AS 1418 / AS 2550.

How to use this overhead crane annual service procedure

  1. Complete the full monthly inspection procedure first. All monthly items carry forward into the annual service.: Work through every item on the monthly inspection checklist, including wire rope visual inspection, hook condition, brake testing, limit switch testing, controls, electrical systems, runway inspection and lubrication, before beginning the annual-only tasks.
  2. Isolate the crane from production. Ensure the area below is clear, barricaded and locked out. Arrange for calibrated test weights to be available.: Coordinate with production to schedule the crane out of service. Isolate the main power supply and apply a lockout/tagout. Barricade the area below the crane and post warning signage. Arrange for NATA-calibrated test weights equal to the crane rated capacity to be delivered to site.
  3. Measure wire rope diameter at 3 points along its length. Count broken wires per lay length and compare to AS 2759 rejection criteria. Record all measurements.: Use a wire rope calliper to measure the rope diameter at three evenly spaced points along its working length. Count the number of broken wires visible in any single lay length and compare to the rejection criteria in AS 2759. Record all measurements and compare to previous annual readings to track the rate of deterioration.
  4. Perform a full brake overhaul: strip, inspect and reline hoist and travel brake linings if worn. Adjust brake torque to manufacturer specification.: Remove the hoist and travel brake covers, strip the brake assemblies and measure lining thickness. Replace linings if worn to or below the manufacturer minimum. Inspect brake drums or discs for scoring and heat damage. Reassemble and adjust brake torque using a torque wrench to the manufacturer specification.
  5. Conduct a structural inspection of main beams, end carriages, connection welds and runway beams. Arrange NDT of critical welds if due per the manufacturer's schedule or 10-year interval.: Visually inspect the main beams, end carriages and all connection welds for cracks, corrosion, distortion and paint failure. Check bolted connections for looseness. If NDT is due, engage a qualified NDT technician to perform magnetic particle or ultrasonic testing on critical welds identified in the manufacturer inspection plan.
  6. Perform a rated capacity load test using calibrated weights at SWL. Verify the crane holds the load with correct brake operation, no structural deflection beyond limits and all safety devices functioning.: Attach the calibrated test weights to the hook and lift to a height of approximately 300 mm. Hold the load for a minimum of 10 minutes and observe for any drift, brake slip or abnormal deflection. Test all safety devices (overload, limit switches, emergency stop) with the load applied. Record the test weight, hold time and results.
  7. Test electrical insulation resistance on all motors and contactors. Record readings and compare to acceptable limits.: Isolate each motor from the drive and apply a 500 V or 1,000 V megger test to each winding phase to ground. Record the megaohm readings. Test contactor coils for insulation resistance. Compare all readings to the manufacturer minimum acceptable values and flag any readings showing a declining trend.
  8. Inspect or change hoist gearbox oil (sample for analysis or drain and refill). Replace worn trolley and travel wheels if required.: Check the hoist gearbox oil level and condition. Either take a sample for laboratory analysis or drain and refill with the manufacturer-specified oil. Inspect trolley and travel wheels for flat spots, flange wear and bearing condition. Replace any wheels that exceed the manufacturer wear limits.
  9. Survey runway rail alignment. Recalibrate overload protection (if fitted).: Use a laser alignment tool or steel tape to survey the runway rails for straightness, gauge and levelness. Record deviations and compare to AS 1418 tolerances. Recalibrate the overload protection system using calibrated weights, confirming it activates at the correct percentage of SWL as specified by the manufacturer.
  10. Update the compliance sticker and logbook. Complete certification per AS 1418 / AS 2550. Sign off and set the next service dates.: Apply a new compliance sticker showing the inspection date, next due date and inspector details. Update the crane logbook with all measurements, test results and any corrective actions. Issue the annual certification per AS 1418 and AS 2550. Obtain inspector, maintenance manager and site manager signatures.

In MapTrack, you can schedule and track maintenance digitally. Each submission is stored as a timestamped PDF against the asset record.

Get the free templateEnter your email above to download the full overhead crane annual service procedure as a PDF.Back to download form

How often should you complete this service procedure?

The annual service must be performed every 12 months and is typically combined with the annual compliance inspection required under AS 1418.10 and AS 2550. Monthly inspections should continue between annual services, covering operational testing, brake checks, limit switch testing and lubrication. Daily pre-use checks by the operator should confirm wire rope condition, hook safety latch, brakes and controls before each shift. High-duty cycle cranes in steel mills, foundries or container terminals may require more frequent comprehensive inspections based on duty classification.

The annual service should be timed to coincide with the crane's registration renewal date where possible. For cranes in high-utilisation environments, consider supplementing the annual service with quarterly structural inspections. In MapTrack, calendar-based triggers ensure every crane receives its annual service on time, with digital records that satisfy regulatory and insurance requirements.

Frequently asked questions

An overhead crane annual service includes all monthly inspection items plus 12 additional actions: wire rope diameter measurement at 3 points and broken wire count per lay length (compared to AS 2759 rejection criteria), full brake overhaul (hoist and travel brakes with lining replacement if worn), structural inspection of main beams, end carriages and connection welds, NDT of critical welds (if due per manufacturer or 10-year schedule), rated capacity load test with calibrated weights, electrical insulation resistance testing of all motors and contactors, hoist gearbox oil inspection or change, replacement of worn trolley and travel wheels, runway rail alignment survey, overload protection recalibration, compliance sticker update and certification per AS 1418 / AS 2550. It takes approximately 4 to 8 hours.

Carry-forward (or cumulative) servicing means that each higher-level service includes all tasks from the level below. The annual service includes all monthly inspection items. This ensures that when the annual service is performed, the crane also receives a full monthly inspection as part of the same procedure. The annual service adds wire rope measurement, brake overhaul, structural NDT, load testing, electrical testing and certification on top of the standard monthly checks.

Overhead cranes in Australia are governed by AS 1418 (Cranes, hoists and winches) and AS 2550 (Cranes, hoists and winches - Safe use). Wire rope rejection criteria are covered by AS 2759. Annual services must include certification per these standards. The annual service also typically requires a rated capacity load test with calibrated weights. State WHS regulations may impose additional requirements. Always ensure services are performed by a competent person as defined by the relevant legislation.

An overhead crane annual service typically takes 4 to 8 hours depending on the crane size, SWL, number of hoists and whether NDT is required. The load test alone can take 1 to 2 hours including setup and weight positioning. Planning for a full day of crane downtime allows adequate time for thorough inspection, measurement, testing and documentation without rushing safety-critical tasks.

Yes. This overhead crane annual service checklist is completely free to download and use. Open the template in your browser and print or save as PDF. No account or sign-up is required. If you want to digitise inspections with automatic scheduling, photo capture and compliance dashboards, MapTrack can help. Book a free demo to see how it works for your operation.

Applicable regulatory standards

This template aligns with the following regulations and standards:

  • AS 1418 Cranes, hoists and winches
  • AS 2550 Cranes, hoists and winches - Safe use
  • AS 2759 Steel wire rope - Use, operation and maintenance
  • OSHA 29 CFR 1910.179 Overhead and gantry cranes

Overhead crane annual service procedure preview

Overhead crane annual service procedure template preview showing fields and layout

The numbers behind this overhead crane annual service procedure

Every figure below is sourced and dated, so you can quote it in a toolbox talk, a budget case or a board paper without having to chase the original report.

Embed this free template on your website

Run an industry blog, trade association site, or training resource? Drop a preview of this free overhead crane annual service procedure straight into your page. The snippet is self-contained, needs no scripts, and links readers back to the full free template.

<div style="max-width:480px;font-family:system-ui,-apple-system,'Segoe UI',Roboto,sans-serif;border:1px solid #E5E7EB;border-radius:12px;padding:20px;background:#ffffff;">
  <p style="font-size:12px;font-weight:700;letter-spacing:0.05em;text-transform:uppercase;color:#071D49;margin:0;">Free template</p>
  <p style="font-size:18px;font-weight:700;color:#071D49;margin:6px 0 0;">Overhead crane annual service procedure</p>
  <ul style="margin:12px 0 0;padding-left:18px;color:#374151;font-size:14px;line-height:1.6;">
    <li style="margin:4px 0;">Wire rope measurement: diameter at 3 points, broken wires per lay length, compared to AS 2759 rejection criteria.</li>
    <li style="margin:4px 0;">Brake overhaul: full overhaul of hoist and travel brakes, reline linings if worn, adjust torque.</li>
    <li style="margin:4px 0;">Structural inspection: main beams, end carriages, connection welds, runway beams.</li>
    <li style="margin:4px 0;">NDT: non-destructive testing of critical welds (if due per manufacturer or 10-year schedule).</li>
    <li style="margin:4px 0;">Load testing: rated capacity load test (SWL) with calibrated weights.</li>
    <li style="margin:4px 0;">Electrical testing: insulation resistance test of all motors and contactors.</li>
  </ul>
  <p style="font-size:13px;color:#6B7280;margin:14px 0 0;padding-top:12px;border-top:1px solid #E5E7EB;">Free <a href="https://www.maptrack.com/templates/overhead-crane-annual-service" style="color:#071D49;font-weight:600;text-decoration:none;">Overhead crane annual service procedure</a> by MapTrack</p>
</div>

Free to reuse, including commercially. This template is published under a Creative Commons Attribution 4.0 licence. Copy it, adapt it, put it on your own site or in your own docs. All we ask is that you credit MapTrack with a link back to this page. The snippet above already includes that credit, so if you use it as-is you’re covered.

Cite this template

Writing about this topic? You’re welcome to quote this checklist. Here’s the wording to use so your readers can find the original.

The MapTrack overhead crane annual service procedure contains 12 checks across 9 sections.

Short attribution
MapTrack Overhead crane annual service procedure, https://www.maptrack.com/templates/overhead-crane-annual-service
Reference list
MapTrack. (2026). Overhead crane annual service procedure [Checklist template]. Retrieved from https://www.maptrack.com/templates/overhead-crane-annual-service

Free to reuse with credit under a Creative Commons Attribution 4.0 licence. If you’d rather link straight to it, the page is https://www.maptrack.com/templates/overhead-crane-annual-service.

Need to schedule and track maintenance digitally?

Register every overhead crane in MapTrack, attach digital forms, and get a complete history of every inspection, service and compliance record.

Maintenance and work orders · All templates · Pricing · Book a demo