Skip to main content
Skip to download form

Free crane wire rope inspection checklist

Free crane wire rope inspection checklist (PDF-ready). Broken-wire count, diameter, corrosion and discard criteria per AS 2759 and ISO 4309.

Updated 24 May 2026

Crane Wire Rope Inspection Checklist

Component inspection and discard criteria per AS 2759 and ISO 4309

Your logo here
0 of 25 checks

Rope identification

1Rope position, ID, install date and hours
2Construction, diameter, lay direction and lay length
3IWRC or fibre core confirmed
4Cross-reference to rope certificate and OEM rope spec
5Any swap or splice since last inspection noted

Diameter & broken wire measurement

6Diameter at three points 90 degrees apart at multiple locations
710 percent diameter reduction rule per AS 2759
8Broken wires per lay length against discard table
9Broken wires concentrated in a single strand
10High-stress zones near drum, sheaves and termination

Corrosion & deformation

11External corrosion (light, heavy, scaling)
12Internal corrosion (open strands or MRT where accessible)
13Kinking, birdcaging or core protrusion
14Dog-legging, waviness or local crushing
15Heat, electrical arc or chemical contamination

Drum, fleet angle & sheaves

16Drum spooling, crossing, gapping or layering
17Fleet angle to first sheave within OEM limit
18Sheave grooves, throat wear and bearing freeplay
19Termination inspection (wedge, swage, spelter, eye)
20Lubrication coverage and dry zones

Disposition & evidence

21Fit for service / watch list / retire now decision
22Watch list shorter interval set in days or hours
23Photo evidence of any discard-criteria finding
24Rope history file and crane record updated
25Competent inspector name, licence and sign off

How to use: download the PDF, print or complete digitally on any device.

  • PDF format, ready to print or fill on screen
  • Use as-is or customise to suit your operation
  • Go digital in MapTrack for photos, alerts and audit trails

Two ways to use it

Use in MapTrack →

Download the free PDF

Use it digitally instead

Unlimited users

These same 25 checks, already built.

G2 rating 4.9 out of 5Capterra rating 5.0 out of 5
  • Scan the asset’s QR tag with any phone
  • Submitted forms can trigger alerts
  • Photos on fails, audit-ready records
  • Export responses, PDF reports with your logo

Free trial. No credit card needed.

Trusted by teams across Australia and New Zealand

We respect your privacy. Unsubscribe anytime.

These templates are free general guides provided as-is. They do not constitute legal, safety or compliance advice. You are responsible for ensuring any form meets your specific workplace obligations, industry standards and applicable regulations.

Don't just download it - use it live. Start a free workspace with this crane wire rope inspection checklist already built, so your crew can run it from a phone.

Jarrod Milford

Jarrod Milford

Commercial Director

Updated 24 May 2026

Key takeaways

  • The MapTrack crane wire rope inspection checklist contains 25 checks across 5 sections. Sections covered: Rope identification, Diameter & broken wire measurement, Corrosion & deformation, Drum, fleet angle & sheaves, Disposition & evidence.

Enter your email below to download this crane wire rope inspection checklist as a ready-to-use PDF.

Used by construction, mining and field service teams

Saunders InternationalMineral ResourcesSupagasHacer GroupMetro TunnelUltrabuilt

What is a crane wire rope inspection checklist?

A crane wire rope inspection checklist is the component-level record used by a competent person to inspect each running and standing wire rope on a crane and decide whether it stays in service, goes on the watch list, or is retired and replaced. It applies to the hoist rope, luffing rope, pendant ropes and any guy or stay ropes on mobile, tower, overhead, bridge and gantry cranes. Unlike a full crane inspection that covers structure, hydraulics and controls, this checklist focuses on the rope itself: identification (size, construction, lay direction, IWRC or fibre core), broken-wire count per lay length per rope construction class, rope diameter measurement against nominal, external corrosion, internal corrosion where accessible, kinking, birdcaging, core protrusion, drum spooling, fleet angle, the termination at each end (wedge socket, swaged, spelter or eye splice), lubrication condition, and the final end-of-life decision.

AS 2759 (Steel wire rope - Use, inspection and discard criteria) is the Australian standard, and ISO 4309 (Cranes - Wire ropes - Care, maintenance, installation, examination and discard) is the international reference that most OEM manuals point to. ASME B30.30 covers the same ground for US-aligned major-contractor work. Each AS 2550 series part references AS 2759 for the rope on that crane type, and WHS Regulation 5.1 makes rope condition part of the PCBU plant inspection duty. Where rope is found at or near the discard threshold, the inspector either retires it on the spot or sets a shorter inspection interval until replacement. A printed checklist supports the rope inspector at the crane; a digital record in MapTrack ties each inspection to the crane serial, the rope serial or batch, the install date and the running-hour count so the rope retirement decision is defensible later.

Learn more about compliance and inspections in MapTrack.

Benefits of using this crane wire rope inspection checklist

  • Discard-criteria accountability: Each rope decision is signed against the competent inspector who counted broken wires and measured diameter, not a generic crane signature.
  • AS 2759 and ISO 4309 alignment: The checklist captures the exact discard criteria from both standards so audits and OEM warranty claims are straightforward.
  • Per-rope traceability: Hoist, luffing and pendant ropes are inspected individually with their own ID, install date and running-hour count.
  • Defensible retirement decisions: A rope retired in service has the inspection record, photo and measurement to support the call later.
  • Replacement-pattern visibility: Repeat early retirements on a crane point to fleet-angle or drum-grooving issues rather than rope quality.
  • Service planning: Inspections feed into the planned rope-change schedule so cranes do not go off-hire for an unplanned change.
  • Lifecycle records: Every rope change, lubrication, inspection and discard sits against the crane for the full life of the asset.

Benefits of digitising forms in MapTrack

When you digitise wire rope checklists in MapTrack, you get:

  • Field users can easily scan a QR code to complete a form on mobile. Unlimited users.
  • Automatically get alerts when faults are identified.
  • Link every form digitally as a PDF to the relevant asset, location or person.
  • Receive a digital PDF copy with every submission to your email.
  • Ability to share forms digitally.
  • Build conditional logic (show or hide questions based on answers).
  • Take pictures or attach photos. Not possible with a paper-based form.
  • Electronic signatures.
  • Edit forms later without reprinting.
  • Restrict permissions (who can view, complete or approve).
  • Build forms with AI (describe what you need and MapTrack suggests the form).
  • Escalate critical hazards instantly to safety managers via push notification.
  • Maintain an auditable safety register that satisfies WHS regulator requests.
  • Correlate incident trends across sites with built-in safety analytics.

Book a demo to see how MapTrack handles wire rope checklists.

Try MapTrack free for 30 days

Full access to every feature. No credit card required. Per-asset pricing so you scale as your fleet grows.

  • No credit card required
  • 30 days free trial
  • Cancel anytime

1-2 days/week saved

Bloody amazing! We used to spend 1-2 days a week tracking and managing our generators alone.
Saunders International

Steve McAllister

Asset Coordinator, Saunders International

What to include in a crane wire rope inspection checklist

This crane wire rope inspection checklist covers 14 key areas:

  • Rope identification: position (hoist/luffing/pendant), ID, install date, hours since install.
  • Rope construction: nominal diameter, construction (e.g. 6x36 IWRC), lay direction and lay length.
  • Visual length-by-length walk: full rope length inspected with the rope under controlled tension.
  • Broken wire count per lay length: against the discard threshold for that rope construction class.
  • Rope diameter measurement: at three points 90 degrees apart, compared against nominal and 10 percent reduction rule.
  • External corrosion: pitting, light surface rust, heavy red rust or scaling.
  • Internal corrosion: where accessible by opening the strands or with magnetic rope test (MRT) if available.
  • Deformation: kinking, birdcaging, core protrusion, dog-legging, waviness or local crushing.
  • Drum spooling and fleet angle: review of layering on the drum and fleet angle through the first sheave.
  • Sheaves and grooves: groove gauge check, throat wear and bearing freeplay (recorded separately but noted here).
  • Termination inspection: wedge socket alignment, swage marking, spelter cone, eye splice or pressed sleeve.
  • Lubrication condition: rope dressing coverage and absence of dry zones.
  • End-of-life decision: keep in service, watch list with shorter interval, or retire and replace now.
  • Inspector sign-off: name, competent-person status and date.

How to use this crane wire rope inspection checklist

  1. Plan the inspection and isolate the crane.: Pull the rope log including ID, construction, install date and running hours. Confirm the inspection scope and isolate the crane for stationary rope inspection. For a running inspection (e.g. on a long hoist), arrange a competent operator and a clear lifting area, with the rope under controlled light tension.
  2. Identify the rope and confirm construction.: Confirm position (hoist, luffing, pendant), ID and serial, install date and hours since install. Confirm construction (e.g. 6x36 WS IWRC), nominal diameter and lay direction against the crane data plate or rope certificate. Note any rope swap or splice since the last inspection.
  3. Walk the full length and measure.: Walk the entire rope length under controlled tension. Measure diameter at three points 90 degrees apart at multiple locations, particularly at the high-stress zones near the drum, sheaves and termination. Compare against nominal and the AS 2759 10 percent diameter-reduction rule.
  4. Count broken wires and inspect for deformation.: Count broken wires per lay length and compare against the discard threshold for that rope construction class in AS 2759 and ISO 4309. Inspect for kinking, birdcaging, core protrusion, dog-legging, local crushing and waviness. Flag any heat damage, electrical arcing or chemical contamination.
  5. Inspect corrosion, lubrication and terminations.: Inspect for external corrosion (light, heavy or scaling). Where accessible, open strands or use MRT for internal corrosion. Inspect each termination (wedge socket alignment, swage marking, eye splice). Check rope dressing coverage and any dry zones along the rope, particularly inside the drum lay.
  6. Check drum spooling, fleet angle and sheaves.: Review the rope layering on the drum for crossing, gapping or layering issues. Check the fleet angle into the first sheave (typical limit 1.5 degrees for grooved drums, 2 degrees for plain). Note any sheave groove wear, throat narrowing or bearing freeplay that may be damaging the rope.
  7. Make the end-of-life decision and record.: Mark the rope as fit for service, watch list (with a shorter inspection interval), or retire and replace now. Photograph any discard-criteria finding. Sign the rope record, update install or retirement date and the rope-history file. In MapTrack the inspection attaches to the rope ID and the crane, and the next inspection is scheduled automatically.

In MapTrack, you can digitise safety inspections and compliance forms. Each submission is stored as a timestamped PDF against the asset record.

Get the free templateEnter your email above to download the full crane wire rope inspection checklist as a PDF.Back to download form

How often should you complete this checklist?

AS 2759 and ISO 4309 set the inspection cadence the rope inspector should follow. The crane operator runs a visual pre-start rope check each shift, looking for obvious damage at the visible drum lay and at the hook block. A monthly visual inspection by a trained technician covers more of the rope under light tension. A quarterly inspection by a competent person covers the full rope length with measurements and broken-wire counts. A 12-monthly major rope inspection sits inside the annual crane major inspection and goes deeper, including internal corrosion checks or magnetic rope testing where the rope is critical. Any heat event, chemical contamination, impact, drum spooling failure, fleet-angle issue or near-miss triggers an out-of-cycle inspection of the affected rope before the crane returns to service. In MapTrack the rope inspection schedule sits against the rope ID rather than the crane, so a rope swap resets the clock automatically.

Frequently asked questions

AS 2759 (Steel wire rope - Use, inspection and discard criteria) is the Australian standard for crane wire rope use, inspection and discard. ISO 4309 is the international reference most OEM manuals also point to and the criteria are broadly aligned. AS 2550 series parts (mobile, tower, bridge and gantry) reference AS 2759 for the rope on that crane type, and WHS Regulation 5.1 makes rope condition part of the PCBU plant inspection duty.

The threshold depends on the rope construction class. AS 2759 and ISO 4309 give discard tables by rope construction (e.g. 6x19, 6x36 WS IWRC) and by application class (running rope versus standing rope). For a typical 6x36 WS IWRC running hoist rope, around 6 randomly distributed broken wires per lay length, or 3 in a single strand, is the discard threshold. Always work from the discard table for the exact rope construction on the crane.

AS 2759 and ISO 4309 require a rope to be retired when the actual diameter has reduced by 10 percent or more from the nominal diameter. The measurement is taken at three points 90 degrees apart at multiple positions along the rope, particularly at the high-stress zones near the drum, sheaves and termination. Even local reduction at one location is enough to retire the rope.

A visual pre-start check at every shift by the operator, a monthly inspection by a trained technician, a quarterly inspection by a competent person with measurements and broken-wire counts, and a full annual major inspection as part of the crane annual inspection. Any heat, chemical, impact or spooling event triggers an out-of-cycle inspection before the crane returns to service. The interval can be shorter for high-cycle ropes or harsh environments.

A running crane rope at or beyond the discard threshold is retired and replaced. Localised splicing of a running rope is not acceptable. Standing pendant ropes and guy ropes can have terminations replaced where the rope itself remains within criteria, and the OEM manual is the source of truth. Replacement rope must match the original construction, diameter and lay direction unless an engineered change is approved.

Yes. This crane wire rope inspection checklist is completely free to download and use - open the HTML file in any browser and use Print then Save as PDF. No MapTrack account is required. It suits competent persons inspecting hoist, luffing and pendant ropes on mobile, tower, overhead, bridge and gantry cranes. If you later want to move off paper and spreadsheets, MapTrack turns this into a live digital inspection: broken-wire counts and diameter measurements recorded against each rope ID, the inspection schedule tied to the rope rather than the crane so a rope swap resets the clock, photos against every discard-criteria finding, and automated reminders with a complete timestamped audit trail. Start free at maptrack.com/free-trial or book a demo.

Applicable regulatory standards

This template aligns with the following regulations and standards:

  • AS 2759 - Steel wire rope - Use, inspection and discard criteria
  • ISO 4309 - Cranes - Wire ropes - Care, maintenance, installation, examination and discard
  • AS 2550.1 - Cranes, hoists and winches (Safe use - General requirements)
  • WHS Regulations 2011 - Chapter 5, Part 5.1 (Registration and inspection of plant)
  • ASME B30.30 - Ropes

Crane Wire Rope Inspection Checklist preview

Crane Wire Rope Inspection Checklist template preview showing fields and layout

The numbers behind this crane wire rope inspection checklist

Every figure below is sourced and dated, so you can quote it in a toolbox talk, a budget case or a board paper without having to chase the original report.

Embed this free template on your website

Run an industry blog, trade association site, or training resource? Drop a preview of this free crane wire rope inspection checklist straight into your page. The snippet is self-contained, needs no scripts, and links readers back to the full free template.

<div style="max-width:480px;font-family:system-ui,-apple-system,'Segoe UI',Roboto,sans-serif;border:1px solid #E5E7EB;border-radius:12px;padding:20px;background:#ffffff;">
  <p style="font-size:12px;font-weight:700;letter-spacing:0.05em;text-transform:uppercase;color:#071D49;margin:0;">Free template</p>
  <p style="font-size:18px;font-weight:700;color:#071D49;margin:6px 0 0;">Crane Wire Rope Inspection Checklist</p>
  <ul style="margin:12px 0 0;padding-left:18px;color:#374151;font-size:14px;line-height:1.6;">
    <li style="margin:4px 0;">Rope identification: position (hoist/luffing/pendant), ID, install date, hours since install.</li>
    <li style="margin:4px 0;">Rope construction: nominal diameter, construction (e.g. 6x36 IWRC), lay direction and lay length.</li>
    <li style="margin:4px 0;">Visual length-by-length walk: full rope length inspected with the rope under controlled tension.</li>
    <li style="margin:4px 0;">Broken wire count per lay length: against the discard threshold for that rope construction class.</li>
    <li style="margin:4px 0;">Rope diameter measurement: at three points 90 degrees apart, compared against nominal and 10 percent reduction rule.</li>
    <li style="margin:4px 0;">External corrosion: pitting, light surface rust, heavy red rust or scaling.</li>
  </ul>
  <p style="font-size:13px;color:#6B7280;margin:14px 0 0;padding-top:12px;border-top:1px solid #E5E7EB;">Free <a href="https://www.maptrack.com/templates/crane-wire-rope-inspection-checklist" style="color:#071D49;font-weight:600;text-decoration:none;">Crane Wire Rope Inspection Checklist</a> by MapTrack</p>
</div>

Free to reuse, including commercially. This template is published under a Creative Commons Attribution 4.0 licence. Copy it, adapt it, put it on your own site or in your own docs. All we ask is that you credit MapTrack with a link back to this page. The snippet above already includes that credit, so if you use it as-is you’re covered.

Cite this template

Writing about this topic? You’re welcome to quote this checklist. Here’s the wording to use so your readers can find the original.

The MapTrack crane wire rope inspection checklist contains 25 checks across 5 sections.

Short attribution
MapTrack Crane Wire Rope Inspection Checklist, https://www.maptrack.com/templates/crane-wire-rope-inspection-checklist
Reference list
MapTrack. (2026). Crane Wire Rope Inspection Checklist [Checklist template]. Retrieved from https://www.maptrack.com/templates/crane-wire-rope-inspection-checklist

Free to reuse with credit under a Creative Commons Attribution 4.0 licence. If you’d rather link straight to it, the page is https://www.maptrack.com/templates/crane-wire-rope-inspection-checklist.

Need to digitise safety inspections and compliance forms?

Register every wire rope in MapTrack, attach digital forms, and get a complete history of every inspection, service and compliance record.

Compliance and inspections · All templates · Pricing · Book a demo