Free spare parts requisition form
Free spare parts requisition form as PDF or Excel (XLSX). Request and issue parts by part number, quantity, work order reference and approver.
Updated 10 Aug 2026
Spare Parts Requisition
List each part on its own row. Record the part number, quantity requested and the quantity actually issued by the store.
| # | Part no. | Description | Bin / loc. | Qty req. | Qty issued | Unit cost | Line total |
|---|---|---|---|---|---|---|---|
| e.g. | - | Excavator - 8 tonne | - | 1 | 1 | 145,000 | - |
| 1 | |||||||
| 2 | |||||||
| 3 | |||||||
| 4 | |||||||
| 5 |
The PDF includes all 12 numbered rows, ready to print or fill on screen.
Requested by
Signature
Print name
Date
Approved by
Signature
Print name
Date
How to use: download the PDF, print or complete digitally on any device.
- PDF format, ready to print or fill on screen
- Use as-is or customise to suit your operation
- Go digital in MapTrack for photos, alerts and audit trails
Download formats
- Spare parts requisition form PDF
PDF: Print-ready requisition with parts table, work order reference, cost centre and approval sign-off.
- Spare parts requisition form XLSX
XLSX: Editable Excel workbook with the same parts table and charging fields, ready to total per requisition.
Two ways to use it
Use in MapTrack →Use it digitally instead
Unlimited usersThese same 7 columns, already built.
- Scan the asset’s QR tag with any phone
- Submitted forms can trigger alerts
- Photos on fails, audit-ready records
- Export responses, PDF reports with your logo
Free trial. No credit card needed.
Trusted by teams across Australia and New Zealand
We respect your privacy. Unsubscribe anytime.
These templates are free general guides provided as-is. They do not constitute legal, safety or compliance advice. You are responsible for ensuring any form meets your specific workplace obligations, industry standards and applicable regulations.
Don't just download it - use it live. Start a free workspace with this spare parts requisition form already built, so your crew can run it from a phone.
Commercial Director
Key takeaways
- A spare parts requisition records a single request to issue parts from the store, linked to a work order and signed off by an approver.
- Capturing the work order reference and cost centre on each requisition is what lets you charge parts back to the right job and asset.
- Each issued line should reduce the on-hand quantity in the spare parts inventory so stock records stay accurate.
- An approver sign-off before parts leave the store controls cost and prevents unauthorised draw-down of critical spares.
Enter your email below to download this spare parts requisition form as a ready-to-use PDF.
Used by construction, mining and field service teams
What is a spare parts requisition form?
A spare parts requisition form is a transactional document used to request and issue specific parts from a store or workshop, usually against a maintenance work order. It records who is requesting the parts, the part numbers and quantities wanted, the work order or job reference, the asset or equipment being repaired, the cost centre to charge, and an approver sign-off authorising the issue. Unlike a stock count sheet, which tallies what is on the shelf, a requisition records a single movement of parts off the shelf and into a job.
Maintenance fitters, supervisors and storepersons use the requisition to keep parts issues controlled and traceable. It stops parts walking out of the store unrecorded, gives an approver the chance to question cost or substitute a part before it is issued, and creates the paper trail that lets finance charge the parts back to the right job, asset and cost centre. Each line issued should also be deducted from the spare parts inventory so on-hand counts stay accurate. In MapTrack, parts are issued against a work order and the on-hand quantity in the inventory adjusts automatically, so the requisition, the job cost and the stock record all stay in step. The duty to maintain plant under the WHS Regulations 2011 assumes repairs use the correct, traceable parts, and a signed requisition is part of that record.
Learn more about maintenance and work orders in MapTrack.
Benefits of using this spare parts requisition form
- Cost control: an approver sign-off before parts leave the store gives a checkpoint to question cost or substitute a part.
- Job costing: a work order reference and cost centre on each requisition charge parts back to the right job and asset.
- Accurate stock: every issued line is deducted from the spare parts inventory so on-hand counts stay reliable.
- Traceability: a signed record shows who requested and authorised each part, which matters during audits and warranty claims.
- Less shrinkage: requiring a requisition stops parts leaving the store unrecorded and makes losses obvious quickly.
- Faster turnaround: a clear request with part numbers and quantities lets the storeperson pick and issue without back-and-forth.
- Critical spares protected: authorisation prevents unplanned draw-down of critical spares that another job may need first.
Benefits of digitising forms in MapTrack
When you move your forms from paper to MapTrack, you get:
- Field users can easily scan a QR code to complete a form on mobile. Unlimited users.
- Automatically get alerts when faults are identified.
- Link every form digitally as a PDF to the relevant asset, location or person.
- Receive a digital PDF copy with every submission to your email.
- Ability to share forms digitally.
- Build conditional logic (show or hide questions based on answers).
- Take pictures or attach photos. Not possible with a paper-based form.
- Electronic signatures.
- Edit forms later without reprinting.
- Restrict permissions (who can view, complete or approve).
- Build forms with AI (describe what you need and MapTrack suggests the form).
- Trigger work orders automatically when a fault is logged during an inspection.
- Track service intervals by hours, kilometres or calendar date in one place.
- Attach supplier invoices and parts receipts to each maintenance record.
Book a demo to see how MapTrack handles forms.
Try MapTrack free for 30 days
Full access to every feature. No credit card required. Per-asset pricing so you scale as your fleet grows.
- No credit card required
- 30 days free trial
- Cancel anytime
1-2 days/week saved
“Bloody amazing! We used to spend 1-2 days a week tracking and managing our generators alone.”
Steve McAllister
Asset Coordinator, Saunders International
What to include in a spare parts requisition form
This spare parts requisition form covers 11 key areas:
- Requisition header: requisition number, date raised, store or workshop, and the requester name and role.
- Work order reference: the work order or job number the parts are being drawn for.
- Asset / equipment: the machine or asset being repaired, with its asset ID.
- Cost centre: the cost centre, department or project to charge the parts to.
- Priority: routine, urgent or breakdown, so the store can sequence picks.
- Part lines: part number, description, quantity requested and quantity issued for each part.
- Bin location: where each part is held, to speed the pick.
- Unit cost and line total: optional cost per part and line value for job costing.
- Requested by: signature and date of the person raising the requisition.
- Approved by: signature, name and date of the supervisor authorising the issue.
- Issued by: signature and date of the storeperson who picked and issued the parts.
How to use this spare parts requisition form
- Raise the requisition against the work order that needs the parts.: Start a new requisition, give it a number and date, and record the work order or job reference and the asset being repaired. Linking the request to a specific job from the outset is what makes the parts cost traceable back to that work order and asset later.
- List each part with its part number and the quantity requested.: Enter the part number, a clear description and the quantity wanted for every line. Use the exact stock code from the spare parts inventory so the storeperson picks the right item and the on-hand count can be reduced accurately when the parts are issued.
- Set the priority and the cost centre to charge.: Mark the requisition routine, urgent or breakdown so the store can sequence it against other demands, and record the cost centre, department or project the parts should be charged to. This ensures the cost lands against the right budget rather than a general account.
- Send the requisition for approval before parts are issued.: Route the requisition to the supervisor or approver, who checks the parts, quantities and cost against the job and authorises the issue. This checkpoint catches over-ordering, wrong parts and unplanned draw-down of critical spares before anything leaves the store.
- Issue the parts and record the quantity actually issued.: The storeperson picks the approved parts, records the quantity issued against each line (which may differ from the quantity requested), and signs the requisition. Any shortfall or substitution is noted so the requester and the work order reflect what was genuinely supplied.
- Update the inventory and file the completed requisition.: Deduct each issued quantity from the spare parts inventory so on-hand counts stay accurate, then file the signed requisition against the work order. The completed form becomes the record for job costing, stock reconciliation and any later warranty or audit query.
In MapTrack, you can schedule and track maintenance digitally. Each submission is stored as a timestamped PDF against the asset record.
Get the free templateEnter your email above to download the full spare parts requisition form as a PDF.Back to download formHow often should you complete this form?
Raise a spare parts requisition every time parts are drawn from the store for a job, rather than letting parts leave unrecorded. For planned maintenance, requisitions are often raised with the work order so parts are kitted before the job starts; for breakdowns they are raised on demand. Reconcile issued requisitions against the spare parts inventory regularly so stock records and job costs agree. In MapTrack, issuing parts against a work order updates the on-hand quantity automatically, so a separate reconciliation step is rarely needed.
Frequently asked questions
Applicable regulatory standards
This template aligns with the following regulations and standards:
- WHS Regulations 2011, Chapter 5 - Plant and Structures (duty to maintain plant using correct, traceable parts)
- ISO 55001 - Asset Management Systems (controlled provision of resources, including spare parts, to assets)
- ISO 9001 - Quality Management Systems (control of provided parts and traceability of repairs)
Spare parts requisition form preview

The numbers behind this spare parts requisition form
Every figure below is sourced and dated, so you can quote it in a toolbox talk, a budget case or a board paper without having to chase the original report.
Embed this free template on your website
Run an industry blog, trade association site, or training resource? Drop a preview of this free spare parts requisition form straight into your page. The snippet is self-contained, needs no scripts, and links readers back to the full free template.
<div style="max-width:480px;font-family:system-ui,-apple-system,'Segoe UI',Roboto,sans-serif;border:1px solid #E5E7EB;border-radius:12px;padding:20px;background:#ffffff;">
<p style="font-size:12px;font-weight:700;letter-spacing:0.05em;text-transform:uppercase;color:#071D49;margin:0;">Free template</p>
<p style="font-size:18px;font-weight:700;color:#071D49;margin:6px 0 0;">Spare parts requisition form</p>
<ul style="margin:12px 0 0;padding-left:18px;color:#374151;font-size:14px;line-height:1.6;">
<li style="margin:4px 0;">Requisition header: requisition number, date raised, store or workshop, and the requester name and role.</li>
<li style="margin:4px 0;">Work order reference: the work order or job number the parts are being drawn for.</li>
<li style="margin:4px 0;">Asset / equipment: the machine or asset being repaired, with its asset ID.</li>
<li style="margin:4px 0;">Cost centre: the cost centre, department or project to charge the parts to.</li>
<li style="margin:4px 0;">Priority: routine, urgent or breakdown, so the store can sequence picks.</li>
<li style="margin:4px 0;">Part lines: part number, description, quantity requested and quantity issued for each part.</li>
</ul>
<p style="font-size:13px;color:#6B7280;margin:14px 0 0;padding-top:12px;border-top:1px solid #E5E7EB;">Free <a href="https://www.maptrack.com/templates/spare-parts-requisition-form" style="color:#071D49;font-weight:600;text-decoration:none;">Spare parts requisition form</a> by MapTrack</p>
</div>Free to reuse, including commercially. This template is published under a Creative Commons Attribution 4.0 licence. Copy it, adapt it, put it on your own site or in your own docs. All we ask is that you credit MapTrack with a link back to this page. The snippet above already includes that credit, so if you use it as-is you’re covered.
Cite this template
Writing about this topic? You’re welcome to quote this checklist. Here’s the wording to use so your readers can find the original.
- Short attribution
- MapTrack Spare parts requisition form, https://www.maptrack.com/templates/spare-parts-requisition-form
- Reference list
- MapTrack. (2026). Spare parts requisition form [Checklist template]. Retrieved from https://www.maptrack.com/templates/spare-parts-requisition-form
Free to reuse with credit under a Creative Commons Attribution 4.0 licence. If you’d rather link straight to it, the page is https://www.maptrack.com/templates/spare-parts-requisition-form.
Need to schedule and track maintenance digitally?
Register every asset in MapTrack, attach digital forms, and get a complete history of every inspection, service and compliance record.
Maintenance and work orders · All templates · Pricing · Book a demo