Free CDM construction phase plan template
Free CDM 2015 construction phase plan template (PDF-ready). Covers principal contractor duties, risk management and welfare per CDM Regulations.
Updated 10 Aug 2026
CDM Construction Phase Plan
CDM 2015 Regulation 12 - Principal contractor construction phase health and safety plan.
Project Description & Management
Arrangements for Managing Significant Risks
Site Rules & Welfare
Emergency Procedures
Communication, Induction & Training
Monitoring & Review
How to use: download the PDF, print or complete digitally on any device.
- PDF format, ready to print or fill on screen
- Use as-is or customise to suit your operation
- Go digital in MapTrack for photos, alerts and audit trails
Download free PDF template
Use in MapTrack →Trusted by teams across Australia and New Zealand
We respect your privacy. Unsubscribe anytime.
Or set it up in MapTrack
- Fill it in on a phone, attach photos to any check
- Automatic reports and audit trails
- The same checks as the PDF, ready to configure
Free 30-day trial. No credit card. Personal email accepted.
Don't just download it - use it live. Start a free workspace with this CDM construction phase plan template already built, so your crew can run it from a phone.
Commercial Director
Key takeaways
- The MapTrack CDM construction phase plan template contains 26 checks across 6 sections. Sections covered: Project Description & Management, Arrangements for Managing Significant Risks, Site Rules & Welfare, Emergency Procedures, Communication, Induction & Training, Monitoring & Review.
Enter your email below to download this CDM construction phase plan template as a ready-to-use PDF.
Used by construction, mining and field service teams
What is a CDM construction phase plan template?
A CDM construction phase plan is a document required under the Construction (Design and Management) Regulations 2015 (CDM 2015) for every construction project in Great Britain. The plan is prepared by the principal contractor before the construction phase begins and sets out the arrangements for managing health and safety during the construction work. It must describe the project, its management structure, the arrangements for controlling significant risks, site rules, welfare facilities, and the means by which the plan will be reviewed and updated as the project progresses. The construction phase plan is the principal contractor primary tool for communicating how the project will be managed safely.
CDM 2015 replaced the earlier CDM 2007 Regulations and introduced a clearer structure of duty holder roles: client, principal designer, principal contractor, designers and contractors. Regulation 12 requires the principal contractor to draw up the construction phase plan before the construction phase begins, or to ensure it is drawn up. The plan must be appropriate to the risks involved in the construction work and must be kept up to date throughout the project. For projects with only one contractor, that contractor takes on the principal contractor duties. The HSE (Health and Safety Executive) provides guidance through the CDM 2015 Approved Code of Practice (L153) on what the construction phase plan should contain. Failure to have an adequate construction phase plan is a common enforcement finding and can result in improvement notices, prohibition notices or prosecution.
Learn more about compliance and inspections in MapTrack.
Benefits of using this CDM construction phase plan template
- Regulatory compliance: satisfy the principal contractor duty under CDM 2015 Regulation 12 to prepare a construction phase plan before the construction phase begins.
- Structured risk management: document the arrangements for identifying, assessing and controlling significant health and safety risks throughout the construction project.
- Clear communication: provide all contractors, workers and visitors with a single reference document setting out site rules, emergency procedures and welfare arrangements.
- Duty holder coordination: define the project management structure, roles and responsibilities for the client, principal designer, principal contractor and other contractors.
- Welfare provision: document the welfare facilities provided on site, including toilets, washing facilities, changing rooms, rest areas and drinking water, as required by Schedule 2 of CDM 2015.
- Audit and enforcement readiness: a well-prepared and current construction phase plan demonstrates competence and diligence during HSE inspections and client audits.
Benefits of digitising forms in MapTrack
When you move your plans from paper to MapTrack, you get:
- Field users can easily scan a QR code to complete a form on mobile. Unlimited users.
- Automatically get alerts when faults are identified.
- Link every form digitally as a PDF to the relevant asset, location or person.
- Receive a digital PDF copy with every submission to your email.
- Ability to share forms digitally.
- Build conditional logic (show or hide questions based on answers).
- Take pictures or attach photos. Not possible with a paper-based form.
- Electronic signatures.
- Edit forms later without reprinting.
- Restrict permissions (who can view, complete or approve).
- Build forms with AI (describe what you need and MapTrack suggests the form).
- Escalate critical hazards instantly to safety managers via push notification.
- Maintain an auditable safety register that satisfies WHS regulator requests.
- Correlate incident trends across sites with built-in safety analytics.
Book a demo to see how MapTrack handles plans.
Try MapTrack free for 30 days
Full access to every feature. No credit card required. Per-asset pricing so you scale as your fleet grows.
- No credit card required
- 30 days free trial
- Cancel anytime
1-2 days/week saved
“Bloody amazing! We used to spend 1-2 days a week tracking and managing our generators alone.”
Steve McAllister
Asset Coordinator, Saunders International
What to include in a CDM construction phase plan template
This CDM construction phase plan template covers 10 key areas:
- Project description: project name, site address, client name, principal designer, principal contractor, project start and anticipated completion dates, brief description of the construction work.
- Management structure: organisation chart or list showing the duty holders and their roles, including site manager, site supervisor, health and safety adviser, first aiders, fire wardens.
- Arrangements for managing significant risks: how the principal contractor will identify, assess and control significant risks, including reference to risk assessments, method statements and SWMS.
- Specific risk arrangements: documented controls for each significant risk, including working at height, excavations, confined spaces, asbestos, demolition, temporary works, lifting operations, hot works, electrical safety, traffic management and noise.
- Site rules: mandatory PPE, site access and egress, working hours, smoking policy, drug and alcohol policy, housekeeping standards, visitor management, prohibited activities.
- Emergency procedures: fire and evacuation plan, first aid arrangements, emergency contacts, nearest A&E hospital, procedures for reporting accidents and dangerous occurrences under RIDDOR.
- Welfare facilities: description and location of toilets, washing facilities, changing rooms, rest and eating areas, drinking water provision, as required by CDM 2015 Schedule 2.
- Communication and consultation: how health and safety information will be communicated to workers and contractors, including inductions, toolbox talks, site notice boards and consultation arrangements.
- Monitoring and review: how the plan will be monitored, reviewed and updated as the project progresses, including frequency of reviews, triggers for update and responsibilities.
- Pre-construction information: summary of key information provided by the client and principal designer, including existing health and safety hazards, asbestos surveys, structural condition and ground conditions.
How to use this CDM construction phase plan template
- Gather pre-construction information from the client and principal designer, including existing hazards, asbestos surveys, structural reports and ground condition data.: Under CDM 2015, the client must provide pre-construction information to the principal designer and principal contractor as soon as practicable. Review this information to identify existing risks that will affect the construction phase, such as asbestos-containing materials, contaminated ground, structural instability, underground services and adjacent hazards.
- Define the project description, management structure, duty holder roles and lines of communication.: Document the project name, site address, client, principal designer and principal contractor. Prepare an organisation chart showing the site manager, supervisors, health and safety adviser, first aiders and fire wardens. Clearly state who is responsible for each area of health and safety management and how information will flow between duty holders.
- Identify the significant risks for the project and document the arrangements for managing each one.: Review the project scope, method statements and risk assessments to identify the significant health and safety risks. For each risk (e.g. working at height, excavations, lifting, asbestos, temporary works), document the specific controls, responsible person and monitoring arrangements. Reference the relevant risk assessments and method statements rather than duplicating them in the plan.
- Set out the site rules, welfare facilities, emergency procedures and communication arrangements.: Document the mandatory site rules covering PPE, access, working hours and prohibited activities. Describe the welfare facilities provided and their locations, ensuring compliance with CDM 2015 Schedule 2. Detail the fire and evacuation plan, first aid arrangements, emergency contacts and RIDDOR reporting procedures. Describe how inductions, toolbox talks and safety information will be delivered.
- Issue the plan to all contractors and relevant parties before the construction phase begins, and establish a process for monitoring and review.: The construction phase plan must be in place before construction work starts. Issue the plan or relevant extracts to all contractors working on the project. Establish a review schedule, typically monthly or when significant changes occur, and assign responsibility for updating the plan. Record all reviews and updates with dates and the name of the person making the change.
In MapTrack, you can digitise safety inspections and compliance forms. Each submission is stored as a timestamped PDF against the asset record.
Get the free templateEnter your email above to download the full CDM construction phase plan template as a PDF.Back to download formHow often should you complete this plan?
The construction phase plan must be prepared before the construction phase begins and must be kept up to date throughout the project. It should be reviewed at regular intervals, typically monthly, and updated whenever there is a significant change to the project scope, methodology, management structure, contractors on site or risk profile. Specific triggers for review include the introduction of new high-risk activities (such as demolition, piling or crane operations), changes to the site layout, new or amended pre-construction information from the client or principal designer, incidents or near misses that reveal gaps in the plan, and changes to emergency procedures or welfare facilities. At project completion, the plan should be reviewed one final time and filed as part of the health and safety file.
Frequently asked questions
Applicable regulatory standards
This template aligns with the following regulations and standards:
- CDM 2015 (Construction (Design and Management) Regulations 2015)
- Health and Safety at Work etc. Act 1974
- Management of Health and Safety at Work Regulations 1999
Check the current source
CDM Construction Phase Plan Template preview

The numbers behind this CDM construction phase plan template
Every figure below is sourced and dated, so you can quote it in a toolbox talk, a budget case or a board paper without having to chase the original report.
Embed this free template on your website
Run an industry blog, trade association site, or training resource? Drop a preview of this free CDM construction phase plan template straight into your page. The snippet is self-contained, needs no scripts, and links readers back to the full free template.
<div style="max-width:480px;font-family:system-ui,-apple-system,'Segoe UI',Roboto,sans-serif;border:1px solid #E5E7EB;border-radius:12px;padding:20px;background:#ffffff;">
<p style="font-size:12px;font-weight:700;letter-spacing:0.05em;text-transform:uppercase;color:#071D49;margin:0;">Free template</p>
<p style="font-size:18px;font-weight:700;color:#071D49;margin:6px 0 0;">CDM Construction Phase Plan Template</p>
<ul style="margin:12px 0 0;padding-left:18px;color:#374151;font-size:14px;line-height:1.6;">
<li style="margin:4px 0;">Project description: project name, site address, client name, principal designer, principal contractor, project start and anticipated completion dates, brief description of the construction work.</li>
<li style="margin:4px 0;">Management structure: organisation chart or list showing the duty holders and their roles, including site manager, site supervisor, health and safety adviser, first aiders, fire wardens.</li>
<li style="margin:4px 0;">Arrangements for managing significant risks: how the principal contractor will identify, assess and control significant risks, including reference to risk assessments, method statements and SWMS.</li>
<li style="margin:4px 0;">Specific risk arrangements: documented controls for each significant risk, including working at height, excavations, confined spaces, asbestos, demolition, temporary works, lifting operations, hot works, electrical safety, traffic management and noise.</li>
<li style="margin:4px 0;">Site rules: mandatory PPE, site access and egress, working hours, smoking policy, drug and alcohol policy, housekeeping standards, visitor management, prohibited activities.</li>
<li style="margin:4px 0;">Emergency procedures: fire and evacuation plan, first aid arrangements, emergency contacts, nearest A&E hospital, procedures for reporting accidents and dangerous occurrences under RIDDOR.</li>
</ul>
<p style="font-size:13px;color:#6B7280;margin:14px 0 0;padding-top:12px;border-top:1px solid #E5E7EB;">Free <a href="https://www.maptrack.com/templates/cdm-construction-phase-plan-template" style="color:#071D49;font-weight:600;text-decoration:none;">CDM Construction Phase Plan Template</a> by MapTrack</p>
</div>Free to reuse, including commercially. This template is published under a Creative Commons Attribution 4.0 licence. Copy it, adapt it, put it on your own site or in your own docs. All we ask is that you credit MapTrack with a link back to this page. The snippet above already includes that credit, so if you use it as-is you’re covered.
Cite this template
Writing about this topic? You’re welcome to quote this checklist. Here’s the wording to use so your readers can find the original.
The MapTrack CDM construction phase plan template contains 26 checks across 6 sections.
- Short attribution
- MapTrack CDM Construction Phase Plan Template, https://www.maptrack.com/templates/cdm-construction-phase-plan-template
- Reference list
- MapTrack. (2026). CDM Construction Phase Plan Template [Checklist template]. Retrieved from https://www.maptrack.com/templates/cdm-construction-phase-plan-template
Free to reuse with credit under a Creative Commons Attribution 4.0 licence. If you’d rather link straight to it, the page is https://www.maptrack.com/templates/cdm-construction-phase-plan-template.
Need to digitise safety inspections and compliance forms?
Register every asset in MapTrack, attach digital forms, and get a complete history of every inspection, service and compliance record.
Compliance and inspections · All templates · Pricing · Book a demo