Skip to main content
Skip to download form

Free bunding and secondary containment inspection

Free bunding and secondary containment inspection per AS 1940. Quarterly structural, drainage and capacity verification for bulk chemical storage.

Updated 5 May 2026

Bunding and Secondary Containment Inspection

Quarterly inspection and post-rainfall assessment per AS 1940 and EPA requirements

Your logo here
0 of 28 checks

1. Structural Integrity

1Bund walls free of cracks, spalling, or deterioration
2Floor/base free of cracks or damage
3Joints and penetrations sealed
4Coating/lining intact (no peeling, bubbling, or chemical attack)
5Bund height adequate (freeboard maintained)
6No subsidence or ground movement

2. Drainage and Valves

7Bund drain valve closed and locked
8Valve and pipework in good condition
9No residual liquid in bund (or explain if present)
10Sump pump removed or isolation-locked
11Drainage to trade waste/treatment (not stormwater)

3. Capacity Verification

12No unauthorised items stored in bund reducing capacity
13Accumulated rainwater removed promptly (post-rainfall)
14Calculated capacity still meets 110%/25% rule
15Freeboard adequate for expected rainfall event

4. Containment Fittings

16Pipe penetrations properly sealed (fire-rated if required)
17Cable entries sealed
18Access steps/ladder in good condition
19Level indicator visible and functional (if fitted)
20Overfill alarm/high-level probe operational (if fitted)

5. Contents and Labelling

21All containers within bund in good condition
22Container labels legible and current
23Incompatible chemicals not co-located in same bund
24Manifest matches actual contents

6. Emergency Response

25Spill kit accessible and stocked
26Emergency procedure displayed
27Fire extinguisher accessible (if flammable contents)
28Absorbent booms/pads available for liquid recovery

How to use: download the PDF, print or complete digitally on any device.

  • PDF format, ready to print or fill on screen
  • Use as-is or customise to suit your operation
  • Go digital in MapTrack for photos, alerts and audit trails

Two ways to use it

Use in MapTrack →

Download the free PDF

Use it digitally instead

Unlimited users

These same 28 checks, already built.

G2 rating 4.9 out of 5Capterra rating 5.0 out of 5
  • Scan the asset’s QR tag with any phone
  • Submitted forms can trigger alerts
  • Photos on fails, audit-ready records
  • Export responses, PDF reports with your logo

Free trial. No credit card needed.

Trusted by teams across Australia and New Zealand

We respect your privacy. Unsubscribe anytime.

These templates are free general guides provided as-is. They do not constitute legal, safety or compliance advice. You are responsible for ensuring any form meets your specific workplace obligations, industry standards and applicable regulations.

Don't just download it - use it live. Start a free workspace with this bunding and secondary containment inspection already built, so your crew can run it from a phone.

Jarrod Milford

Jarrod Milford

Commercial Director

Updated 5 May 2026

Key takeaways

  • The MapTrack bunding and secondary containment inspection contains 28 checks across 6 sections. Sections covered: 1. Structural Integrity, 2. Drainage and Valves, 3. Capacity Verification, 4. Containment Fittings, 5. Contents and Labelling, 6. Emergency Response.

Enter your email below to download this bunding and secondary containment inspection as a ready-to-use PDF.

Used by construction, mining and field service teams

Saunders InternationalMineral ResourcesSupagasHacer GroupMetro TunnelUltrabuilt

What is a bunding and secondary containment inspection?

A bunding and secondary containment inspection is a quarterly compliance assessment of all bunded areas and secondary containment systems at sites storing bulk hazardous substances. Under AS 1940 (The storage and handling of flammable and combustible liquids) and state EPA regulations, every facility storing bulk quantities of hazardous liquids must maintain secondary containment (bunding) capable of holding at least 110% of the volume of the largest container within the bund, or 25% of the total stored volume, whichever is greater. The bund must prevent any spilled, leaked or released material from reaching stormwater drains, waterways, groundwater or neighbouring properties.

Bunding systems include concrete bund walls, lined earthen bunds, self-bunded tanks (double-skinned), portable bunding for temporary storage and drip trays for smaller containers. Over time, bunds degrade through cracking, chemical attack, weathering, vehicle damage and settlement. Drainage valves left open (a common compliance failure) completely defeat the containment purpose. Accumulated rainwater reduces available capacity below the minimum requirement. Incompatible materials stored within the same bund create secondary risks if a spill occurs. This quarterly inspection covers structural integrity, drainage valve position, capacity verification (accounting for rainwater, equipment and other items reducing available volume), pipe and fitting penetrations, contained contents compliance and emergency response readiness. Additional inspections are required after significant rainfall events that may have filled or stressed the bund.

Learn more about compliance and inspections in MapTrack.

Benefits of using this bunding and secondary containment inspection

  • Environmental protection: confirms that secondary containment will function as designed if a spill occurs, preventing contamination of soil, groundwater and waterways.
  • EPA compliance: satisfies state EPA licence conditions and AS 1940 requirements for maintenance of secondary containment systems with documented evidence.
  • Capacity assurance: verifies that available containment capacity has not been reduced below the minimum requirement by accumulated rainwater, equipment or debris.
  • Drainage valve compliance: the single most common bunding failure is a drainage valve left open. Weekly or quarterly checks catch this before a spill event exposes the non-compliance.
  • Penalty avoidance: EPA fines for non-compliant bunding can exceed $500,000 for serious environmental harm, plus clean-up costs which frequently reach millions of dollars.
  • Insurance protection: environmental impairment liability policies require evidence of maintained secondary containment as a condition of coverage for pollution events.

Benefits of digitising forms in MapTrack

When you digitise bunding checklists in MapTrack, you get:

  • Field users can easily scan a QR code to complete a form on mobile. Unlimited users.
  • Automatically get alerts when faults are identified.
  • Link every form digitally as a PDF to the relevant asset, location or person.
  • Receive a digital PDF copy with every submission to your email.
  • Ability to share forms digitally.
  • Build conditional logic (show or hide questions based on answers).
  • Take pictures or attach photos. Not possible with a paper-based form.
  • Electronic signatures.
  • Edit forms later without reprinting.
  • Restrict permissions (who can view, complete or approve).
  • Build forms with AI (describe what you need and MapTrack suggests the form).
  • Log spill response actions and containment measures with timestamped evidence.
  • Track waste manifests and disposal records against EPA or state permit conditions.
  • Generate environmental compliance reports for regulator audits in one click.

Book a demo to see how MapTrack handles bunding checklists.

Try MapTrack free for 30 days

Full access to every feature. No credit card required. Per-asset pricing so you scale as your fleet grows.

  • No credit card required
  • 30 days free trial
  • Cancel anytime

1-2 days/week saved

Bloody amazing! We used to spend 1-2 days a week tracking and managing our generators alone.
Saunders International

Steve McAllister

Asset Coordinator, Saunders International

What to include in a bunding and secondary containment inspection

This bunding and secondary containment inspection covers 9 key areas:

  • Bund identification: location, bund number or name, contained substances (DG class), number and size of containers/tanks within the bund, required minimum capacity (110% or 25% calculation).
  • Structural integrity: bund walls (cracks, spalling, erosion, settlement), floor condition (cracks, chemical attack, coating condition), joint sealant condition, coating or liner integrity.
  • Drainage system: valve position (must be closed), valve condition (corrosion, leaks, operability), drain destination when valve is opened, approval process for draining accumulated water.
  • Capacity verification: visual assessment of available capacity, accumulated rainwater depth, equipment or items stored within the bund reducing capacity, calculated remaining capacity vs minimum requirement.
  • Penetrations and fittings: pipe penetrations sealed, cable penetrations sealed, no unsealed holes through bund walls, expansion joints intact.
  • Contents compliance: all containers within the bund are compatible with each other and the bund material, no incompatible chemicals co-bunded, containers properly sealed and labelled.
  • Emergency readiness: spill kit accessible, absorbents appropriate for the contained chemicals, containment booms available (for large bunds), emergency contact information posted.
  • Surrounding area: no stormwater drains within the bund footprint, grade directing any overflow away from sensitive receptors, warning signage in place.
  • Actions and non-conformances: corrective actions for any deficiency, responsible person and due date.

How to use this bunding and secondary containment inspection

  1. Visually inspect the bund walls, floor and joints for structural defects.: Walk the full perimeter of the bund inspecting all walls for cracks (particularly at corners and wall-floor joints), spalling concrete, erosion of earthen bunds, settlement or movement, and coating or liner damage. Inspect the bund floor for cracks, chemical attack evidence (staining, softening), and coating condition. Check all construction joints, expansion joints and sealant for deterioration.
  2. Verify all drainage valves are closed and in serviceable condition.: Check every drainage valve within and associated with the bund. Confirm all valves are in the closed position. Test valve operability by partially opening and reclosing (do not discharge contents to stormwater). Inspect valve bodies for corrosion, leakage past the seal, and mechanical damage. Verify that the valve is a type that fails closed. Document any valve found in the open position as a critical non-conformance.
  3. Assess available containment capacity against the minimum requirement.: Measure or estimate the depth of accumulated rainwater within the bund. Note any equipment, pallets, hoses or other items stored within the bund that reduce available containment volume. Calculate the actual available capacity (total bund volume minus rainwater minus displacement from stored items) and compare to the minimum requirement (110% of largest container or 25% of total stored volume). Arrange water removal if capacity is compromised.
  4. Inspect all penetrations, fittings, contained vessels and chemical compatibility.: Check every pipe, cable and conduit penetration through the bund wall or floor for intact seals. Verify no new penetrations have been made without proper sealing. Inspect all containers and tanks within the bund for leaks, corrosion and label legibility. Confirm all chemicals within the bund are compatible with each other and with the bund material (for example, acids will attack concrete without appropriate coating).
  5. Verify emergency readiness, record findings and schedule corrective actions.: Confirm spill response equipment is accessible and appropriate for the chemicals stored. Check absorbent quantities and condition. Verify emergency contact information and spill response procedures are posted at the bund. Record all findings, photograph any defects, assign corrective actions with responsible persons and due dates. Schedule the next quarterly inspection and note any additional post-rainfall inspections required.

In MapTrack, you can track environmental compliance and waste management digitally. Each submission is stored as a timestamped PDF against the asset record.

Get the free templateEnter your email above to download the full bunding and secondary containment inspection as a PDF.Back to download form

How often should you complete this checklist?

Quarterly inspection is the standard frequency for bunding and secondary containment systems under normal conditions. Additional inspections must be conducted after significant rainfall events (typically greater than 25mm in 24 hours) to verify capacity has not been compromised by accumulated water, and after any spill event within or adjacent to the bund. High-risk sites or those with EPA licence conditions may require monthly inspections. Drainage valve position should ideally be checked weekly as a simple pass/fail. In MapTrack, quarterly inspections are automatically scheduled for each bund location, with weather-triggered additional inspections generated when rainfall thresholds are exceeded at the site.

Frequently asked questions

AS 1940 requires secondary containment (bunding) capable of holding at least 110% of the volume of the largest single container within the bund, or 25% of the total aggregate volume of all containers within the bund, whichever is the greater amount. This ensures that even if the largest container fails completely, the bund can contain the full release plus a safety margin. Some state EPA regulations impose higher requirements.

Quarterly inspection is the standard minimum frequency for formal bunding assessments. Drainage valve position should be verified weekly. Additional inspections are required after significant rainfall events (greater than 25mm in 24 hours), after any spill within the bund, and after any construction or modification work affecting the bund. High-risk sites with EPA licence conditions may require monthly documented inspections.

Drainage valves left in the open position are consistently the most common compliance failure identified during bunding inspections. A valve left open completely defeats the containment purpose, as any spill will drain directly to stormwater or the environment. This typically occurs when operators open the valve to drain accumulated rainwater and forget to close it. Locked-closed valves with a permit-to-open system are the recommended control.

Rainwater can only be drained from a bund to stormwater if it has been confirmed to be uncontaminated. This typically requires visual inspection (no sheen, discolouration or odour), and for higher-risk sites, field testing for hydrocarbons or pH before discharge. Many EPA licences require a documented approval process before any drainage, including sign-off by a responsible person confirming the water is uncontaminated. Contaminated water must be disposed of as trade waste or liquid waste.

Routine quarterly inspections can be conducted by a competent person trained in AS 1940 (The storage and handling of flammable and combustible liquids) and the site dangerous goods management plan. Structural repairs to concrete bunds, coatings or liner systems should be designed and certified by a qualified civil or structural engineer, and the rebuild documented against the original capacity calculation. Major modifications to scheduled premises holding bulk hazardous substances may require notification or approval from the relevant state EPA before work proceeds, and a re-inspection should be conducted before the bund is returned to service.

Applicable regulatory standards

This template aligns with the following regulations and standards:

  • AS 1940 The storage and handling of flammable and combustible liquids
  • EPA Regulations (state-specific) - Secondary containment requirements for scheduled premises
  • WHS Regulations 2011, Chapter 7 - Hazardous chemicals storage
  • Environment Protection Act (VIC/NSW/QLD/WA/SA) - Duty to prevent pollution

Bunding and secondary containment inspection preview

Bunding and secondary containment inspection template preview showing fields and layout

The numbers behind this bunding and secondary containment inspection

Every figure below is sourced and dated, so you can quote it in a toolbox talk, a budget case or a board paper without having to chase the original report.

Embed this free template on your website

Run an industry blog, trade association site, or training resource? Drop a preview of this free bunding and secondary containment inspection straight into your page. The snippet is self-contained, needs no scripts, and links readers back to the full free template.

<div style="max-width:480px;font-family:system-ui,-apple-system,'Segoe UI',Roboto,sans-serif;border:1px solid #E5E7EB;border-radius:12px;padding:20px;background:#ffffff;">
  <p style="font-size:12px;font-weight:700;letter-spacing:0.05em;text-transform:uppercase;color:#071D49;margin:0;">Free template</p>
  <p style="font-size:18px;font-weight:700;color:#071D49;margin:6px 0 0;">Bunding and secondary containment inspection</p>
  <ul style="margin:12px 0 0;padding-left:18px;color:#374151;font-size:14px;line-height:1.6;">
    <li style="margin:4px 0;">Bund identification: location, bund number or name, contained substances (DG class), number and size of containers/tanks within the bund, required minimum capacity (110% or 25% calculation).</li>
    <li style="margin:4px 0;">Structural integrity: bund walls (cracks, spalling, erosion, settlement), floor condition (cracks, chemical attack, coating condition), joint sealant condition, coating or liner integrity.</li>
    <li style="margin:4px 0;">Drainage system: valve position (must be closed), valve condition (corrosion, leaks, operability), drain destination when valve is opened, approval process for draining accumulated water.</li>
    <li style="margin:4px 0;">Capacity verification: visual assessment of available capacity, accumulated rainwater depth, equipment or items stored within the bund reducing capacity, calculated remaining capacity vs minimum requirement.</li>
    <li style="margin:4px 0;">Penetrations and fittings: pipe penetrations sealed, cable penetrations sealed, no unsealed holes through bund walls, expansion joints intact.</li>
    <li style="margin:4px 0;">Contents compliance: all containers within the bund are compatible with each other and the bund material, no incompatible chemicals co-bunded, containers properly sealed and labelled.</li>
  </ul>
  <p style="font-size:13px;color:#6B7280;margin:14px 0 0;padding-top:12px;border-top:1px solid #E5E7EB;">Free <a href="https://www.maptrack.com/templates/bunding-containment-inspection" style="color:#071D49;font-weight:600;text-decoration:none;">Bunding and secondary containment inspection</a> by MapTrack</p>
</div>

Free to reuse, including commercially. This template is published under a Creative Commons Attribution 4.0 licence. Copy it, adapt it, put it on your own site or in your own docs. All we ask is that you credit MapTrack with a link back to this page. The snippet above already includes that credit, so if you use it as-is you’re covered.

Cite this template

Writing about this topic? You’re welcome to quote this checklist. Here’s the wording to use so your readers can find the original.

The MapTrack bunding and secondary containment inspection contains 28 checks across 6 sections.

Short attribution
MapTrack Bunding and secondary containment inspection, https://www.maptrack.com/templates/bunding-containment-inspection
Reference list
MapTrack. (2026). Bunding and secondary containment inspection [Checklist template]. Retrieved from https://www.maptrack.com/templates/bunding-containment-inspection

Free to reuse with credit under a Creative Commons Attribution 4.0 licence. If you’d rather link straight to it, the page is https://www.maptrack.com/templates/bunding-containment-inspection.

Need to track environmental compliance and waste management digitally?

Register every bunding in MapTrack, attach digital forms, and get a complete history of every inspection, service and compliance record.

Compliance and inspections · All templates · Pricing · Book a demo