Free electrical safe work method statement (swms)

Jump to download form ↓

Enter your email below to download this electrical safe work method statement (swms) as a ready-to-use PDF.

Free electrical SWMS template (PDF-ready). Isolation, testing and live-work controls for high-risk electrical construction work under WHS.

Jarrod Milford

Jarrod Milford

Commercial Director

Updated 5 July 2026

Updated 5 July 2026

How to use: download the PDF, print or complete digitally on any device.

  • PDF format, ready to print or fill on screen
  • Use as-is or customise to suit your operation
  • Go digital in MapTrack for photos, alerts and audit trails

Download free PDF template

FreePDFUpdated July 2026

Get your free template

Enter your email to download the electrical safe work method statement (swms) as a free PDF. No sign-up required to use it.

Rated 4.9 on G2Rated 4.9 on Capterra
Your info is secure. No spam, ever.

These templates are free general guides provided as-is. They do not constitute legal, safety or compliance advice. You are responsible for ensuring any form meets your specific workplace obligations, industry standards and applicable regulations.

G2 rating 4.9 out of 5Capterra rating 4.9 out of 5

Trusted by teams across Australia and New Zealand

We respect your privacy. Unsubscribe anytime.

Used by construction, mining and field service teams

Saunders InternationalMineral ResourcesSupagasHacer GroupMetro TunnelUltrabuilt

What is a electrical safe work method statement (swms)?

An electrical Safe Work Method Statement (SWMS) is the high-risk construction work document that sets out how electrical work near or on energised installations will be done safely. It records the job and site, the workers and their electrical licences, the plant and test equipment used, and a row for every work step showing the hazard, the risk rating, the control measures and how each control will be implemented, monitored and reviewed. For electrical trades it centres on isolation and proving dead, lock-out and tag-out, testing before touching, and the strict conditions under which any live work is permitted at all.

An electrical SWMS matters because electrical work is one of the highest-risk activities on any site and, when carried out as construction work near energised installations, is named in the high-risk construction work categories of the model WHS Regulations (in Victoria, the Occupational Health and Safety Regulations 2017), which require a SWMS to be prepared before the work starts. It keeps the isolation and testing sequence explicit so a crew cannot skip a step under time pressure, and it ties the controls to the specific installation or asset being worked on. Kept current and signed on by the crew, it is both a practical safety tool and the objective evidence a regulator or principal contractor will expect to see.

Learn more about compliance and inspections in MapTrack.

Benefits of using this electrical safe work method statement (swms)

  • Isolation discipline: the isolate, lock, tag and prove-dead sequence is written as ordered steps so no one skips proving dead under time pressure.
  • Live-work control: a clear default to de-energise, with strict conditions and authorisation for any live work, keeps the highest-risk task tightly bounded.
  • Licence assurance: recording each worker's electrical licence and any HRWL against the job confirms only qualified people carry out the work.
  • Regulatory fit: as named high-risk construction work, electrical work needs a SWMS, and this template captures the hazard, control and review detail the regulation requires.
  • Test-before-touch: dedicated steps for testing and verification stop assumptions about what is dead and what is still live.
  • Crew sign-on: every electrician and offsider signs on, so the whole crew shares the same understanding of the isolation points and controls.
  • Auditable trail: a dated, signed electrical SWMS against the installation is strong evidence of a controlled process for audits and after an incident.

Benefits of digitising forms in MapTrack

When you move from paper or static PDFs to digital forms in MapTrack, you get:

  • Field users can easily scan a QR code to complete a form on mobile. Unlimited users.
  • Automatically get alerts when faults are identified.
  • Link every form digitally as a PDF to the relevant asset, location or person.
  • Receive a digital PDF copy with every submission to your email.
  • Ability to share forms digitally.
  • Build conditional logic (show or hide questions based on answers).
  • Take pictures or attach photos. Not possible with a paper-based form.
  • Electronic signatures.
  • Edit forms later without reprinting.
  • Restrict permissions (who can view, complete or approve).
  • Build forms with AI (describe what you need and MapTrack suggests the form).
  • Escalate critical hazards instantly to safety managers via push notification.
  • Maintain an auditable safety register that satisfies WHS regulator requests.
  • Correlate incident trends across sites with built-in safety analytics.

Book a demo to see how MapTrack handles forms.

Try MapTrack free for 30 days

Full access to every feature. No credit card required. Per-asset pricing so you scale as your fleet grows.

  • No credit card required
  • 30 days free trial
  • Cancel anytime

1-2 days/week saved

Bloody amazing! We used to spend 1-2 days a week tracking and managing our generators alone.
Saunders International

Steve McAllister

Asset Coordinator, Saunders International

What to include in a electrical safe work method statement (swms)

This electrical safe work method statement (swms) covers 10 key areas:

  • Job description, site or project, principal contractor and the installation or asset worked on
  • SWMS number, date prepared and revision, with the person responsible for the SWMS
  • Workers and their roles, electrical licence numbers and any high-risk work licences
  • Test instruments, plant and PPE used, including insulated tools and voltage rescue kit
  • Isolation points, switchboards and circuits to be isolated, locked and tagged
  • Work steps in order, one row per step, covering isolation, testing and the task itself
  • Hazard, risk rating, control measures and residual risk for each step
  • How each control is implemented, who is responsible, and how it is monitored and reviewed
  • Live-work conditions and authorisation, where de-energising is not reasonably practicable
  • Emergency and rescue arrangements, first aid, and worker sign-on before work starts

How to use this electrical safe work method statement (swms)

  1. Plan the job and confirm competency: Define the electrical work, the installation and the site, then confirm every worker holds the electrical licence for the task and any high-risk work licence needed. Electrical work is named high-risk construction work, so the SWMS must be prepared and understood before anyone starts, not written up afterwards to close a file.
  2. Set the de-energise default and isolation points: Identify every switchboard, circuit and source that must be isolated, and make de-energising the standard approach. List the isolation points in the order they will be locked and tagged, so the crew works to a fixed sequence rather than deciding isolation on the fly at a live board.
  3. Isolate, lock, tag and prove dead: Isolate each source, apply personal locks and danger tags, then prove the circuit dead with a tested and verified voltage instrument before any contact. Record the test-before-touch step explicitly, because assuming a circuit is dead without proving it is the single most common cause of electrical fatalities.
  4. Rate hazards and apply controls per step: For each work step, score the risk and apply controls down the hierarchy, then note who implements each control and how it is monitored. Set out the strict conditions and authorisation for any live work where de-energising is not reasonably practicable, and keep that as the exception rather than the norm.
  5. Sign on, monitor and review: Every worker reads and signs on to the SWMS before starting, and the supervisor authorises the job. Keep the SWMS at the work front, stop work and revise it if the scope or conditions change, and review it after the job or any incident so the isolation and testing controls stay current for the next crew.

In MapTrack, you can digitise safety inspections and compliance forms. Each submission is stored as a timestamped PDF against the asset record.

Get the free templateEnter your email above to download the full electrical safe work method statement (swms) as a PDF.Back to download form

How often should you complete this form?

Prepare an electrical SWMS before the high-risk construction work starts, and review it whenever the work method, the installation, the crew or the site conditions change. It must be kept available for the duration of the work and produced on request by the regulator or principal contractor.

Stop work and revise the SWMS if a control is not being followed or is not working, then re-communicate the change and have the crew sign on again. Formally review the master SWMS after any incident or near miss, after a change to the electrical installation or method, or when a relevant standard or regulation changes.

Frequently asked questions

Electrical work carried out on or near energised electrical installations or services as part of construction work is named in the high-risk construction work categories of the model WHS Regulations (in Victoria, the Occupational Health and Safety Regulations 2017), and a SWMS must be prepared before that work starts. The SWMS must identify the hazards, set out the control measures, and describe how the controls will be implemented, monitored and reviewed. It must be kept available for inspection and produced to the regulator or principal contractor on request. Electrical work also carries separate licensing duties under your state or territory electrical safety law.

The default is to de-energise. Live work should only be considered where it is not reasonably practicable to de-energise, for example where testing or fault-finding genuinely requires the circuit energised, and then only under strict conditions with the right controls, competent workers and authorisation. The SWMS should treat live work as a tightly bounded exception, spell out those conditions, and require additional controls such as insulated tools, barriers, a safety observer and a voltage rescue plan.

The person conducting the business or undertaking that carries out the high-risk construction work is responsible for preparing the SWMS, and it should be done in consultation with the electrical workers who will do the job. Each worker reads and signs on to confirm they understand the hazards and controls before they start, and anyone joining later signs on before beginning. A supervisor or responsible person authorises the work.

A JSA is a general task-based risk assessment that breaks a job into steps and lists hazards and controls, and it is not a legislated document. An electrical SWMS is the specific document the model WHS Regulations require for high-risk construction work: it must not only identify hazards and controls but also describe how each control is implemented, monitored and reviewed, and it must be kept and produced on request. For electrical construction work you need a SWMS, not just a JSA.

Review it before the work starts and again whenever the method, the installation, the plant or the crew changes. Stop work and revise it if a control is not working or not being followed, then have the crew sign on to the updated version. Formally review the master SWMS after any incident or near miss, after a change to the electrical installation or work method, and when a relevant standard or regulation changes.

Yes, it is completely free. Open it in your browser, then use Print and choose Save as PDF. You do not need a MapTrack account. If you want to move beyond paper, MapTrack tracks your test instruments and plant, their calibration and inspection due dates, and the asset history behind each SWMS in one place. Start a free trial or book a demo to see how.

Applicable regulatory standards

This template aligns with the following regulations and standards:

  • Model Work Health and Safety Act (enacted in each state and territory; in Victoria, the Occupational Health and Safety Act 2004)
  • Model Work Health and Safety Regulations, high-risk construction work and SWMS duties (regs 291 and 299-303; in Victoria, the Occupational Health and Safety Regulations 2017)
  • Safe Work Australia Model Code of Practice: Construction work
  • AS/NZS 3000:2018 Electrical installations (Wiring Rules)

Embed this free template on your website

Run an industry blog, trade association site, or training resource? Drop a preview of this free electrical safe work method statement (swms) straight into your page. The snippet is self-contained, needs no scripts, and links readers back to the full free template.

<div style="max-width:480px;font-family:system-ui,-apple-system,'Segoe UI',Roboto,sans-serif;border:1px solid #E5E7EB;border-radius:12px;padding:20px;background:#ffffff;">
  <p style="font-size:12px;font-weight:700;letter-spacing:0.05em;text-transform:uppercase;color:#0E7490;margin:0;">Free template</p>
  <p style="font-size:18px;font-weight:700;color:#071D49;margin:6px 0 0;">Electrical Safe Work Method Statement (SWMS)</p>
  <ul style="margin:12px 0 0;padding-left:18px;color:#374151;font-size:14px;line-height:1.6;">
    <li style="margin:4px 0;">Job description, site or project, principal contractor and the installation or asset worked on</li>
    <li style="margin:4px 0;">SWMS number, date prepared and revision, with the person responsible for the SWMS</li>
    <li style="margin:4px 0;">Workers and their roles, electrical licence numbers and any high-risk work licences</li>
    <li style="margin:4px 0;">Test instruments, plant and PPE used, including insulated tools and voltage rescue kit</li>
    <li style="margin:4px 0;">Isolation points, switchboards and circuits to be isolated, locked and tagged</li>
    <li style="margin:4px 0;">Work steps in order, one row per step, covering isolation, testing and the task itself</li>
  </ul>
  <p style="font-size:13px;color:#6B7280;margin:14px 0 0;padding-top:12px;border-top:1px solid #E5E7EB;">Free <a href="https://www.maptrack.com/templates/electrical-swms-template" style="color:#071D49;font-weight:600;text-decoration:none;">Electrical Safe Work Method Statement (SWMS)</a> by MapTrack</p>
</div>

Please keep the “by MapTrack” attribution link in the snippet.

Need to digitise safety inspections and compliance forms?

Register every asset in MapTrack, attach digital forms, and get a complete history of every inspection, service and compliance record.

Compliance and inspections · All templates · Pricing · Book a demo