To save as PDF: use your browser's PrintSave as PDF or Print to PDF. This checklist prints as 2 pages (A4).

Solar Panel Inspection Checklist

PV system inspection: panels, inverter, wiring, safety & performance

Company logo

PAGE 1 OF 2

System Details

Solar Panels

Mark P (Pass) or F (Fail) for each item. Record notes for any F.

# Check P F Notes
Solar Panels
1Panels clean (no dirt / debris / bird droppings)
2No visible cracks or hotspots
3No delamination or discolouration
4Frames and glass intact
5No shading from new obstructions
6Panel clips and clamps secure
7Labels and serial numbers legible
Mounting & Structure
8Mounting rails secure
9Roof penetrations sealed
10Tilt angle correct
11No corrosion on frames / rails
12Cable management tidy
Solar Panel Inspection - Page 2 of 2
Site
Date
Inspector
# Check P F Notes
Inverter
13Operating normally (no fault lights)
14Display showing expected output
15Ventilation clear
16No unusual noise or smell
17Firmware up to date
Electrical & Safety
18DC isolator functional
19AC isolator functional
20Earth fault interrupter tested
21Cable insulation intact
22Junction boxes sealed
23Earthing conductor connected and tested

Performance

Record expected and actual values. Note any significant variance.

Parameter Expected Actual Notes
System output (kW)
Daily generation (kWh)
Inverter efficiency (%)
String voltages (V)

Declaration

I declare that I have inspected the solar PV system described above and recorded any defects, faults or performance issues. Items marked as Fail require corrective action before the system can be considered fully operational.

Inspector Sign-off
Signature
Print name
Date
Site Manager Sign-off
Signature
Print name
Date