To save as PDF: use your browser's PrintSave as PDF or Print to PDF. This checklist prints as 2 pages (A4).

Piling Rig Daily Pre-Start Checklist

Daily inspection for CFA, driven and bored piling rigs

Company logo

PAGE 1 OF 2

Piling Rig & Operator Details
Rig type

Inspection Items

Circle or mark the applicable column for each item: P = Pass  |  F = Fail  |  N/A = Not applicable. Record notes for any F.

# Check P F N/A Notes / Action
Mast & Structure
1Mast: no visible damage, cracks or deformation
2Kelly bar: condition acceptable, connections tight
3Crowd system: operational, no binding or leaks
4Pins and bolts: secure, no play or cracking
5Counterweight: secure, no damage
Drill Head & Auger
6Drill head: secure, connections tight
7Auger flights: condition acceptable, no excessive wear
8Kelly swivel: operational, no leaks
9Torque head: secure, functioning correctly
10Tool joints: tight, no damage or excessive wear
Hydraulics & Engine
11Hydraulic oil: correct level, no leaks
12Hoses: no chafing, bulging or leaks
13Cylinders: no leaks or scoring
14Engine oil: correct level
15Coolant: correct level, no leaks
16Filters: air and fuel filters clean, not blocked
Tracks & Undercarriage
17Tracks: condition acceptable, no missing pads
18Sprockets: no excessive wear
19Idlers: rotate freely, no leaks
20Rollers: rotate freely, no leaks
21Track tension: correct, even both sides
22Ground clearance: adequate, no obstructions
Piling Rig Pre-Start Checklist - Page 2 of 2
Asset ID
Date
Operator
# Check P F N/A Notes / Action
Winch & Ropes
23Main winch: operational, brake holding
24Auxiliary winch: operational (if fitted)
25Wire ropes: no fraying, kinks or broken wires
26Sheaves: condition acceptable, rotating freely
27Rope terminations: secure, no damage
Safety
28Emergency stop: tested, accessible
29Cab controls: all levers, switches operational
30ROPS / FOPS: intact, no damage
31Fire extinguisher: present, in date, accessible
32Lights: headlights, work lights, indicators operational
33Horn / reversing alarm: audible
Overall Result
PASS: all items satisfactory, piling rig fit for use FAIL: defect(s) identified, see table below

Defects & Action Required  (list any item marked F: reference item # from checklist)

Item # Defect description Action taken / reported to Rectified by / date

Declaration

I declare that I have completed this piling rig pre-start inspection before using this piling rig. I have reported any defects or non-compliant items to my supervisor and will not use this piling rig until any defects that affect safety have been rectified. I understand that failure to complete a pre-start check or to report defects may breach company policy and WHS obligations.

Operator Sign-off
Signature
Print name
Date & time
Supervisor / Reviewer Acknowledgement
Signature
Print name
Date