EWP Pre-Start Checklist

Elevated work platform pre-use inspection | Boom lifts · Scissor lifts · Cherry pickers

Company logo

PAGE 1 OF 2

EWP & Operator Details

Inspection Items — Page 1 of 2

Mark: P = Pass  |  F = Fail  |  N/A = Not applicable. Record notes for any F. Do not operate if any F is present until rectified and signed off by supervisor.

# Check Item P F N/A Notes / Action
A — Ground-Level Inspection (power off)
1Tyres / wheels or tracks: condition, pressure, no damage or flat spotsN/A
2Outriggers / stabilisers: condition, pads, pins — fully retract and extend correctlyN/A
3Chassis and frame: no cracks, corrosion or visible structural damageN/A
4Hydraulic hoses and cylinders: no leaks, no damage or chafingN/A
5Electrical cables and connections: no damage, no exposed wiresN/A
6Pins and retaining clips: all present and secureN/A
7Decals and load charts: present and legibleN/A
8Turntable and slew ring (boom lifts): free of damage, lubricatedN/A
B — Platform Inspection
9Platform floor: clean, non-slip surface, no debris or damageN/A
10Guardrails and mid-rails: secure, no damage or missing sectionsN/A
11Toe-boards: present and secureN/A
12Entry gate / chain: self-closing, functionalN/A
13Anchor points (if harness required): condition, rated, accessibleN/A
14Platform controls: clearly marked, no damageN/A
EWP Pre-Start Checklist — Page 2 of 2
Asset #
Date
Operator

Mark: P = Pass  |  F = Fail  |  N/A = Not applicable. Record notes for any F.

# Check Item P F N/A Notes / Action
C — Operational Checks (power on)
15Engine / motor starts normally; warning lights clear after startupN/A
16All platform controls functional: up/down, drive, slew, telescopeN/A
17Ground controls functional and override platform controlsN/A
18Emergency lowering system: tested and functionalN/A
19Travel and steering (ground level): smooth, responsiveN/A
20Horn: operationalN/A
21Travel alarms / audible alerts: operationalN/A
22Lights and beacon: operationalN/A
23Tilt alarm / sensor (if fitted): activates correctlyN/A
24Limit switches: tested and functionalN/A
D — Safety Equipment
25Harness and lanyard: condition, no damage, in dateN/A
26Harness fit for user: correctly fitted before elevationN/A
27Fire extinguisher: present, charged, in date, accessibleN/A
28Emergency stop button (platform): tested and functionalN/A
29Emergency stop button (ground): tested and functionalN/A
30Wind speed assessment completed (if required)N/A
Overall Result
PASS: fit for operation ACTION REQUIRED: see defects FAIL: do not operate
Defects & Actions

Declaration

I declare that I have completed this pre-start inspection of the above elevated work platform. I have reported all defects and will not operate the EWP if any defect affects safe operation. I confirm I hold the required competency or licence (HRW WP, or applicable attainment for EWPs under 11 m) to operate this plant.

Operator Sign-off
Signature
Print name
Date & Time